4.7 Article

Extending a fuzzy network data envelopment analysis model to measure maturity levels of a performance based-budgeting system: A case study

期刊

EXPERT SYSTEMS WITH APPLICATIONS
卷 200, 期 -, 页码 -

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.eswa.2022.116884

关键词

Data envelopment analysis; Performance-based budgeting; Maturity level; Network structure; Fuzzy logic

资金

  1. Czech Science Foundation [GACR 19-13946S]

向作者/读者索取更多资源

Performance-based budgeting (PBB) aims to improve managerial decisions based on actual performance measures. However, the progress and maturity of PBB implementation are not satisfactory. In this study, a budget assessment framework is proposed to evaluate and improve the performance of organizations implementing PBB. Data envelopment analysis (DEA) methods and fuzzy logic are used to measure and overcome the limitations of existing approaches. A case study in Iran is presented to demonstrate the efficacy and applicability of the proposed framework.
Performance-based budgeting (PBB) aims to formulate and manage public budgetary resources to improve managerial decisions based on actual performance measures of agencies. Although the PBB system has been overwhelmingly applied by various agencies, the progress and maturity of its implementation process are not satisfactory at large. Therefore, it warrants to find, evaluate and improve the performance of organisations in relation to implementing a PBB system. To do so, the composite indicators (CIs) have been proposed to aggregate multiple indicators associated with the PBB system, but their employment is contentious as they often lean on ad- hoc and troublesome assumptions. Data envelopment analysis (DEA) methods as a powerful and established tool help to contend with key limitations of CIs. Although the original DEA method ignores an internal production process, the knowledge of the internal structure of the PBB systems and indicators is of importance to provide further insights when assessing the performance of PBB systems. In this paper, we present a budget assessment framework by breaking a PBB system into two parallel stages including operations performance (OP) and financial performance enhancement (FPE) to open up the black-box structure of the system and consider the indicator hierarchy configuration of each stage. In situations of the hierarchical configuration of indicators, we develop a multilayer parallel network DEA-based CIs model to measure the PBB maturity levels of the system and its stages. It is shown that the discrimination power of the proposed multilayer model is better than the existing models with one layer and in situations of relatively small number of DMUs the model developed in this paper can be a good solution to the dimension reduction of indicators. Moreover, this research leverages fuzzy logic to surmount the subjective information that is often available in collecting indicators of the PBB systems. The major contribution of this research is to examine a case study of a PBB maturity award in Iran, as a developing country with a myriad of financial challenges, to adopt a PBB maturity model as well as point towards the efficacy and applicability of the proposed framework in practice

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据