4.7 Article

A scenario-based approach for optimal operation of energy hub under different schemes and structures

期刊

ENERGY
卷 251, 期 -, 页码 -

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.energy.2022.123740

关键词

Scenario-based approach; Energy hub schemes; Renewable energies; Optimal operation; Heating and cooling component

向作者/读者索取更多资源

Due to the importance of economic and environmental issues in the energy field, the development of smart energy systems and energy hubs has been accelerated. This research proposes a scenario-based approach for the optimal operation of energy hubs considering uncertainties in wind turbines and photovoltaics. The research findings suggest that Structure 3 (AC thorn HP) is more efficient in terms of energy consumption and investment costs when considering investment and operation and maintenance costs.
Because of economic and environmental issues' importance in the energy field, moving toward smart energy systems and energy hubs (EHs) has accelerated. The impacts of uncertainties, e.g., stochastic behaviors of renewable distributed generations (DGs), on EHs are fundamental challenges that should be considered carefully. Although several studies have been done in the area of EHs, a knowledge gap exists about developing an approach considering uncertainties under different EHs' structures and topologies. This research purposes of responding to such a research gap. In this research, a scenario-based approach for EHs' optimal operation considering wind turbine (WT) and photovoltaic (PV) uncertainties is proposed. The proposed approach is applied to EH under different schemes. Using the k-means clustering algorithm decreases the computational burden, while the appropriate accuracy is achievable. The proposed stochastic optimization problem is solved using the genetic algorithm (GA). The comparative view is considered to investigate the impacts of cooling and heating components like the heat pump (HP), absorption chiller (AC), and heat storage (HS) on EH's optimal operation and energy cost. According to this research findings, the EH's daily energy cost under a scheme using the AC, HP, and HS is approximately 6.5% less than a scheme only using HP. Also, using the HS and HP alongside the AC leads to 5.6% and 6.4% cost-saving, respectively. But for a better comparison, the investment and operation and maintenance (O&M) cost are considered, in which case Structure 3 (AC thorn HP) is more efficient both in terms of energy consumption and investment costs.(c) 2022 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据