4.7 Article

A hierarchical model in short-term hydro scheduling with unit commitment and head-dependency

期刊

ENERGY
卷 251, 期 -, 页码 -

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.energy.2022.123908

关键词

Short -term hydro scheduling; Unit commitment; Head-dependency; Mixed integer linear programming; Water head updating; Cascaded reservoirs

向作者/读者索取更多资源

In this study, a hierarchical modeling strategy is used to solve the short-term hydro scheduling problem by decoupling it into load distribution and unit commitment sub-problems. Mixed Integer Linear Programming is employed to solve both sub-problems, and the coordination is achieved through coupling variables. The linearity errors in the model are eliminated with a successive water head updating procedure. The optimal quarter-hourly schedule for the Lancang Cascade is obtained in a short time, considering hydraulic connection, unit operating zones, head-dependency, generation, and water level targets.
The short-term hydro scheduling (STHS) problem has long been studied for decades, with great efforts having been made on improving their solution methods or algorithms. This work instead aims to solve a real-world problem with a hierarchical modeling strategy presented to decouple the STHS problem into two sub-problems: a load distribution (LD) and a unit commitment (UC), which are both solved with the Mixed Integer Linear Programming (MILP) and then coordinated through their coupling variables. The linearity errors in the model can be eliminated with an efficient successive water head updating pro-cedure that adjusts the searching range based on the improvement of the objective. Taking into account the hydraulic connection, unit operating zones, head-dependency, generation and water level targets, the optimal quarter-hourly schedule for Lancang Cascade that consists of 11 hydropower reservoirs and 56 units can be obtained in 1 min for not only all the hydro-plants in the cascade but also every unit within hydro plant. The application results demonstrate that the convergence of the water head updating procedure is intermittent yet guaranteed after about 20 iterations.(c) 2022 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据