An optimization framework for scheduling multi-period multi-product oil pipeline systems under belief degree-based uncertain parameters

期刊

出版社

SPRINGER HEIDELBERG
DOI: 10.1007/s12190-022-01727-w

关键词

Belief degree-based uncertainty; Chance-constrained programming; Multi-product oil pipeline scheduling; Zigzag probability distribution

向作者/读者索取更多资源

This article improves a formulation for scheduling multi-product pipelines in order to minimize operational expenses. It considers factors such as batch sizing limits and inventory carrying costs, and proposes three solution strategies. Numerical demonstrations are used to showcase the efficiency and dependability of the model.
Considering that one of the most significant challenges for oil industry planners is developing an effective schedule plan that reduces costs, increases profitability, and enhances customer satisfaction, this article improves a formulation for scheduling multi-product pipelines. The primary goal is to minimize operational expenses, which include inventory and shortages, interfaces, and labor. Consideration is given to batch sizing limits, inventory carrying costs, backlog, and settlement periods. Additionally, certain parameters have been classified as having the belief degree-based type of uncertainty due to a lack of relevant historical data. As solution strategies, three separate conversion approaches are used. The model's efficiency and dependability, as well as the proposed methodologies, are demonstrated numerically. Sensitivity analysis shows that objective function values are highly dependent on changes in confidence levels, so the best technique is implemented.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据