4.6 Article

Setting MRP Parameters and Optimizing the Production Planning Process

期刊

PROCESSES
卷 10, 期 4, 页码 -

出版社

MDPI
DOI: 10.3390/pr10040690

关键词

Lean management; Material Resources Planning (MRP); ABC inventory analysis; optimization; planning

资金

  1. Scientific Grant Agency of the Ministry of Education, Science, Research and Sport of the Slovak Republic
  2. Slovak Academy Sciences [VEGA 1/0641/20]

向作者/读者索取更多资源

This article presents a systematic framework that combines the ABC method and the MRP planning method in Lean management. The benefits of implementing this combination are demonstrated through a case study, showing significant reduction in changeover downtimes and financial savings.
This article describes a methodical framework that combines two specific methods of Lean management, namely the ABC method and the MRP planning method. The article further argues that combining the ABC inventory method with subsequent MRP planning is beneficial if the combination is implemented in practice. To demonstrate the benefits, the framework is tested using a case study company. The presented case-study problem is to reduce the number of changeover downtimes in the environment of an engineering production company. The researched company deals with the problem of setting up production lines in a way to minimize the number of downtimes within one work shift. Within the solution, four possible variants of the production plan are presented. By combining the ABC and MRP methods, up to four changeovers can be saved, which in financial terms represents a saving of about EUR 450,000 per year.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据