4.6 Article

Concept-Based Integration of Project Management and Strategic Management of Rubber Dam Projects Using the SWOT-AHP Method

期刊

SUSTAINABILITY
卷 14, 期 5, 页码 -

出版社

MDPI
DOI: 10.3390/su14052541

关键词

priority matrix; project management; rubber dam projects; strategic management; strategy matrix; SWOT-AHP method

资金

  1. Ministry of Science and Higher Education of Poland [3841/E-41/S/2021]

向作者/读者索取更多资源

This study integrates project management standards and processes with strategic management to analyze and evaluate the factors of rubber dam projects in Iran. It proposes the main strategy and priorities for the organization, aiming to produce operational benefits.
The utilization of rubber dams for water supply and irrigated agriculture is becoming an emerging practice in developing countries. In this study, based on the SWOT (strengths, weaknesses, opportunities, threats) analysis, a variety of standards and processes in project management (PM) are integrated within the framework of the strategic management (SM) of an organization responsible for the management of new small-scale hydraulic infrastructures, e.g., rubber dam projects. The most important internal and external factors in PM and organizational SM of rubber dam projects in Iran are initially identified, adapted, and integrated. Thereafter, the factors are weighted, evaluated, and analyzed using the analytic hierarchy process (AHP) and combined SWOT-AHP methods. Based on the results, the total weighted scores of the internal and external factors are 2.353 and 2.718, respectively. Hence, the derived main strategy of the organization is WO. This means that the weakness factors can be reduced through the opportunities available for projects. Finally, a new methodology called strategy matrix resulting from priority matrix is proposed to prioritize and determine the organization's possible strategies. The outputs demonstrate the first three priorities as a mix of the main strategy alternatives, e.g., W1O1, W7O1, and W9O1. The organization, hence, is proposed to use the economic benefits of rubber dam projects to further monitor organizational units, the project's resource management, and the project's stakeholder management (not the project's stakeholders). The proposed research could be conceived as a pilot for sustainable management in developing countries, where strategic project management can produce important operational benefits.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据