4.7 Article

Optimal Integrated Energy System Planning With DG Uncertainty Affine Model and Carbon Emissions Charges

期刊

IEEE TRANSACTIONS ON SUSTAINABLE ENERGY
卷 13, 期 2, 页码 905-918

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TSTE.2021.3139109

关键词

Planning; Manganese; Costs; Carbon dioxide; Resistance heating; Germanium; Uncertainty; IES; affine model; carbon emission; uncertainty model of DG

资金

  1. National Key Research and Development Program of China [2018YFB1500800]
  2. National Natural Science Foundation of China [51807134]
  3. State Key Laboratory of Power System and Generation Equipment [SKLD21KM10]
  4. Natural Sciences and Engineering Research Council of Canada (NSERC) [RGPIN-2018-06724]
  5. Science and Technology Project of State Grid Corporation of China

向作者/读者索取更多资源

This paper proposes an optimal planning model considering DG output uncertainties and carbon emission punishments. By introducing an affine model based on the matrix form and a tiered dynamic charging cost model, the overall costs of investment, operation, and carbon emissions can be minimized. The improved IQPSO algorithm is able to solve the multi-dimensional nonlinear model effectively. The simulation results demonstrate that the proposed method can effectively reduce the impacts of DG uncertainty and carbon emissions at the planning stage of IES with better long-term economy.
Integrated energy systems (IES) with cooling, heat, electricity, and natural gas have drawn significant interest recently as we embrace more sustainable energy a midst climate change. However, the uncertain outputs of distributed generators (DGs) make it challenging for IES planning while maintaining low-cost installation and operation under carbon emission constraints. To tackle the challenge, this work proposes an optimal planning model for IES considering both DG output uncertainties and carbon emission punishments. To reduce the conservatism of the widely-adopted interval and affine algorithms, an affine model based on the matrix form is first proposed to model the uncertain DG outputs. A tiered dynamic charging cost model is further developed to introduce and minimize carbon emissions with a punishment mechanism at the planning stage. Based on these two sub-models, an optimal IES planning model is proposed to simultaneously minimize the overall costs of investment, operation, and carbon emissions. To solve the multi-dimensional nonlinear model, an improved quantum particle swarm optimization (IQPSO) algorithm is introduced with enhanced global optimization ability. Simulation results on the IEEE 33-bus and 69-bus IES network have demonstrated that the proposed method can effectively reduce the impacts of DG uncertainty and carbon emissions at the planning stage of IES with a better long-term economy.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据