Risk Propagation in Multilayer Heterogeneous Network of Coupled System of Large Engineering Project

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)ME.1943-5479.0001022

关键词

Risk propagation; Multilayer heterogeneous network; Coupled system; Improved related schedule risk analysis model (Improved CSRAM); Large engineering project (LEP)

资金

  1. National Natural Science Foundation of China [51779195, 51878385, 52079073]
  2. Open Foundation of the Hubei Key Laboratory of Construction and Management in Hydropower Engineering [2020KSD10]

向作者/读者索取更多资源

This research addresses the challenges of project risk propagation control in large engineering projects (LEPs) by proposing a multilayer heterogeneous network model and an improved schedule risk analysis model. The study considers multiple uncertainties and provides comprehensive and valuable risk information, contributing to the extension of the current theory of risk propagation in complex systems.
Because of the long duration, multiplicity of technical disciplines, large number of project stakeholders, and high levels of complexity and uncertainty, project risk propagation control in large engineering projects (LEPs) is an enormous challenge for project managers. Although previous research has attained many risk propagation achievements regarding complex systems, complex coupled system modeling ignores the heterogeneity of the organizational structure of the actual LEPs, which affects the reliability of the calculated risk propagation results. To bridge this gap, this paper abstracts the LEP structure into a multilayer heterogeneous network comprising the stakeholder network and the project schedule network and proposes a method for characterizing the coupling relationship between two layers of the heterogeneous network. Then, the multiple uncertainties in risk propagation are greatly considered, and a risk propagation model is established based on the multilayer heterogeneous network and improved related schedule risk analysis model (CSRAM). Finally, the proposed model is applied to determine the delayed payment risk propagation in an actual LEP to verify the feasibility of the proposed model. The results indicate the following: (1) the delayed payment risk of a stakeholder evolves into a delay in the entire project; (2) several groups of comparative simulation experiments show that the proposed model, which considers multiple uncertainties and actual networks, includes more comprehensive and valuable risk information; (3) the multiple uncertainties of risk propagation are gradually superimposed with the increase in the number of construction activities affected by risk propagation; and (4) controlling for risk factors that have a high degree of influence and a large negative impact is an effective measure for blocking risk propagation across multilayer networks. This research lays an important foundation for risk propagation control in LEPs and contributes to the extension of the current theory of risk propagation in complex systems.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据