4.6 Review

Forward-Looking State-of-the-Art Review on Earned Value Management Systems: The Disconnect between Academia and Industry

相关参考文献

注意:仅列出部分参考文献,下载原文获取全部文献信息。
Article Business

Grey Earned Value Management: Theory and Applications

Amin Mahmoudi et al.

Summary: Project stakeholders need to closely monitor project progress and take necessary actions to manage delays. Earned value management is a method that can predict the required costs for project completion, but uncertainties in the data may lead to project failure. Grey theory provides a potential approach for handling uncertainties.

IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT (2021)

Article Engineering, Industrial

Earned Value Management System State of Practice: Identifying Critical Subprocesses, Challenges, and Environment Factors of a High-Performing EVMS

Vartenie Aramali et al.

Summary: This study investigates the state of practice of Earned Value Management Systems (EVMS) through a large survey of expert respondents, identifying challenges and key factors. The results show that planning and scheduling have the greatest impact on EVMS, while top factors impacting the EVMS environment include organizational culture and efficient development processes. Leadership attitude is found to be the most critical challenge in implementing EVMS.

JOURNAL OF MANAGEMENT IN ENGINEERING (2021)

Article Construction & Building Technology

Applying and Assessing Performance of Earned Duration Management Control Charts for EPC Project Duration Monitoring

Rodrigo Votto et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2020)

Article Engineering, Industrial

Critical Factors for Improving Reliability of Project Control Metrics throughout Project Life Cycle

Resulali E. Orgut et al.

JOURNAL OF MANAGEMENT IN ENGINEERING (2020)

Article Computer Science, Interdisciplinary Applications

Z-number based earned value management (ZEVM): A novel pragmatic contribution towards a possibilistic cost-duration assessment

Sepehr Hendiani et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2020)

Article Management

The impact of a limited budget on the corrective action taking process

Jie Song et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2020)

Article Engineering, Industrial

Integrating Corrective Actions in Project Time Forecasting Using Exponential Smoothing

Annelies Martens et al.

JOURNAL OF MANAGEMENT IN ENGINEERING (2020)

Article Computer Science, Information Systems

Measuring the Impact of Scope Changes on Project Plan Using EVM

Saman Tariq et al.

IEEE ACCESS (2020)

Article Management

Exploring earned value management in the Spanish construction industry as a pathway to competitive advantage

Monty Sutrisna et al.

INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT (2020)

Article Operations Research & Management Science

CRITICAL FACTORS AND BENEFITS IN THE USE OF EARNED VALUE MANAGEMENT IN CONSTRUCTION

Joaquim Teixeira Netto et al.

BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT (2020)

Article Engineering, Industrial

What CPI=0.85 Really Means: A Probabilistic Extension of the Estimate at Completion

Byung-Cheol Kim et al.

JOURNAL OF MANAGEMENT IN ENGINEERING (2019)

Article Construction & Building Technology

Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects

P. Ballesteros-Perez et al.

AUTOMATION IN CONSTRUCTION (2019)

Article Engineering, Industrial

Quantifying FEED Maturity and Its Impact on Project Performance in Large Industrial Projects

Abdulrahman Yussef et al.

JOURNAL OF MANAGEMENT IN ENGINEERING (2019)

Article Construction & Building Technology

Integrated project delivery with BIM: An automated EVM-based approach

Fans Elghaish et al.

AUTOMATION IN CONSTRUCTION (2019)

Proceedings Paper Engineering, Industrial

A new fuzzy approach for project time assessment under uncertain conditions

Amir Mohammad Hamzeh et al.

PROCEEDINGS OF 2019 15TH IRAN INTERNATIONAL INDUSTRIAL ENGINEERING CONFERENCE (IIIEC) (2019)

Article Construction & Building Technology

Developing a Novel Framework to Manage Schedule Contingency Using Theory of Constraints and Earned Schedule Method

Mohammed Wajdi Hammad et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2018)

Article Construction & Building Technology

Developing a Quality-Embedded EVM Tool to Facilitate the Iron Triangle in Architectural, Construction, and Engineering Practices

Hong Yeow Ong et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2018)

Article Construction & Building Technology

Developing a Novel Framework to Manage Schedule Contingency Using Theory of Constraints and Earned Schedule Method

Mohammed Wajdi Hammad et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2018)

Article Construction & Building Technology

Developing a Quality-Embedded EVM Tool to Facilitate the Iron Triangle in Architectural, Construction, and Engineering Practices

Hong Yeow Ong et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2018)

Proceedings Paper Computer Science, Interdisciplinary Applications

Using a Socio-Technical Systems Approach for a Sales Process Improvement

Ilia Bider et al.

2018 IEEE 22ND INTERNATIONAL ENTERPRISE DISTRIBUTED OBJECT COMPUTING CONFERENCE WORKSHOPS (EDOCW 2018) (2018)

Article Management

Conditions of success for earned value analysis in projects

David Bryde et al.

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2018)

Article Management

A buffer control method for top-down project control

Annelies Martens et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2017)

Article Construction & Building Technology

Estimated Cost at Completion: Integrating Risk into Earned Value Management

Suqrat Babar et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2017)

Article Engineering, Industrial

Implementation of Earned Value Management in Unit-Price Payment Contracts

Miguel Picornell et al.

JOURNAL OF MANAGEMENT IN ENGINEERING (2017)

Article Engineering, Industrial

Project Duration Forecasting Using Earned Duration Management with Exponential Smoothing Techniques

Homayoun Khamooshi et al.

JOURNAL OF MANAGEMENT IN ENGINEERING (2017)

Article Construction & Building Technology

Estimated Cost at Completion: Integrating Risk into Earned Value Management

Suqrat Babar et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2017)

Article Management

Extensions of earned value management: Using the earned incentive metric to improve signal quality

L. -P. Kerkhove et al.

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2017)

Article Computer Science, Artificial Intelligence

A comparative study of Artificial Intelligence methods for project duration forecasting

Mathieu Wauters et al.

EXPERT SYSTEMS WITH APPLICATIONS (2016)

Article Construction & Building Technology

Estimating Cumulative Damages due to Disruptions in Repetitive Construction

Jae-Seob Lee

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2016)

Article Engineering, Industrial

Probabilistic Evaluation of Cost Performance Stability in Earned Value Management

Byung-Cheol Kim

JOURNAL OF MANAGEMENT IN ENGINEERING (2016)

Article Construction & Building Technology

Estimating Cumulative Damages due to Disruptions in Repetitive Construction

Jae-Seob Lee

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2016)

Article Engineering, Civil

Come back sociotechnical systems theory, all is forgiven ...

Guy Walker

CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS (2015)

Article Computer Science, Artificial Intelligence

A multivariate approach for top-down project control using earned value management

Jeroen Colin et al.

DECISION SUPPORT SYSTEMS (2015)

Article Computer Science, Artificial Intelligence

A comparison of the performance of various project control methods using earned value management systems

Jeroen Colin et al.

EXPERT SYSTEMS WITH APPLICATIONS (2015)

Article Engineering, Industrial

Dynamic Control Thresholds for Consistent Earned Value Analysis and Reliable Early Warning

Byung-Cheol Kim

JOURNAL OF MANAGEMENT IN ENGINEERING (2015)

Article Engineering, Industrial

Project Completion Time and Cost Prediction Using Change Point Analysis

Seyed Taha Hossein Mortaji et al.

JOURNAL OF MANAGEMENT IN ENGINEERING (2015)

Proceedings Paper Computer Science, Information Systems

Quality: the third element of earned value management

Marcelo Dodson et al.

CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERIS/PROJMAN / HCIST 2015 (2015)

Article Management

Classification of articles and journals on project control and earned value management

Laura L. Willems et al.

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2015)

Article Management

Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management

Jordy Batselier et al.

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2015)

Article Management

Construction and evaluation framework for a real-life project database

Jordy Batselier et al.

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2015)

Article Engineering, Aerospace

Improved cost monitoring and control through the Earned Value Management System

Howard Hunter et al.

ACTA ASTRONAUTICA (2014)

Editorial Material Computer Science, Information Systems

What literature review is not: diversity, boundaries and recommendations

Frantz Rowe

EUROPEAN JOURNAL OF INFORMATION SYSTEMS (2014)

Article Construction & Building Technology

Sensitivity of Earned Value Schedule Forecasting to S-Curve Patterns

Byung-Cheol Kim et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2014)

Article Engineering, Civil

Implementing earned value management using bridge information modeling

Mohamed Marzouk et al.

KSCE JOURNAL OF CIVIL ENGINEERING (2014)

Article Engineering, Multidisciplinary

Management of construction cost contingency covering upside and downside risks

Ibrahim Adel Eldosouky et al.

ALEXANDRIA ENGINEERING JOURNAL (2014)

Article Management

An Earned Schedule-based regression model to improve cost estimate at completion

Timur Narbaev et al.

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2014)

Article Management

EDM: Earned Duration Management, a new approach to schedule performance management and measurement

Homayoun Khamooshi et al.

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2014)

Article Physics, Fluids & Plasmas

Implementation of Earned Value Management Tools in the Wendelstein 7-X Project

Axel Lorenz et al.

IEEE TRANSACTIONS ON PLASMA SCIENCE (2012)

Article Management

History, practices, and future of earned value management in government: Perspectives from NASA

Young Hoon Kwak et al.

PROJECT MANAGEMENT JOURNAL (2012)

Article Computer Science, Cybernetics

Socio-technical systems: From design methods to systems engineering

Gordon Baxter et al.

INTERACTING WITH COMPUTERS (2011)

Article Construction & Building Technology

Combination of Project Cost Forecasts in Earned Value Management

Byung-Cheol Kim et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2011)

Proceedings Paper Construction & Building Technology

Improving Construction Management of an Educational Center by Applying Earned Value Technique

A. Naderpour et al.

PROCEEDINGS OF THE TWELFTH EAST ASIA-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION (EASEC12) (2011)

Article Management

An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index

Javier Pajares et al.

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2011)

Article Construction & Building Technology

Probabilistic Forecasting of Project Duration Using Kalman Filter and the Earned Value Method

Byung-Cheol Kim et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2010)

Article Engineering, Industrial

Alignment during preproject planning

AF Griffith et al.

JOURNAL OF MANAGEMENT IN ENGINEERING (2001)