4.7 Article

Energy-efficient project scheduling with supplier selection in manufacturing projects

相关参考文献

注意:仅列出部分参考文献,下载原文获取全部文献信息。
Article Construction & Building Technology

Memetic algorithm for solving resource constrained project scheduling problems

Humyun Fuad Rahman et al.

AUTOMATION IN CONSTRUCTION (2020)

Article Computer Science, Interdisciplinary Applications

Efficient priority rules for project scheduling under dynamic environments: A heuristic approach

Ripon K. Chakrabortty et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2020)

Article Computer Science, Artificial Intelligence

Energy-efficient flexible flow shop scheduling with worker flexibility

Guiliang Gong et al.

EXPERT SYSTEMS WITH APPLICATIONS (2020)

Article Green & Sustainable Science & Technology

Supplier sustainability performance evaluation using the analytic network process

Mihalis Giannakis et al.

JOURNAL OF CLEANER PRODUCTION (2020)

Article Green & Sustainable Science & Technology

An optimization method for energy-conscious production in flexible machining job shops with dynamic job arrivals and machine breakdowns

Yufeng Li et al.

JOURNAL OF CLEANER PRODUCTION (2020)

Article Computer Science, Artificial Intelligence

An energy-efficient permutation flowshop scheduling problem

Hande Oztop et al.

EXPERT SYSTEMS WITH APPLICATIONS (2020)

Article Computer Science, Interdisciplinary Applications

A mathematical model for project scheduling and material ordering problem with sustainability considerations: A case study in Iran

Farhad Habibi et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2019)

Article Green & Sustainable Science & Technology

Energy-efficient scheduling for multi-objective flexible job shops with variable processing speeds by grey wolf optimization

Shu Luo et al.

JOURNAL OF CLEANER PRODUCTION (2019)

Article Computer Science, Information Systems

Real-Time Order Acceptance and Scheduling Problems in a Flow Shop Environment Using Hybrid GA-PSO Algorithm

Humyun Fuad Rahman et al.

IEEE ACCESS (2019)

Article Computer Science, Information Systems

Green Job Shop Scheduling problem With Discrete Whale Optimization Algorithm

Tianhua Jiang et al.

IEEE ACCESS (2019)

Article Transportation

Green port project scheduling with comprehensive efficiency consideration

Wei Wang et al.

MARITIME POLICY & MANAGEMENT (2019)

Article Automation & Control Systems

Permutation Flow Shop Scheduling With Batch Delivery to Multiple Customers in Supply Chains

Kai Wang et al.

IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS (2018)

Article Business

A Novel Teaching-Learning-Based Optimization Algorithm for Energy-Efficient Scheduling in Hybrid Flow Shop

Deming Lei et al.

IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT (2018)

Article Green & Sustainable Science & Technology

A multi-objective approach to welding shop scheduling for makespan, noise pollution and energy consumption

Chao Lu et al.

JOURNAL OF CLEANER PRODUCTION (2018)

Article Green & Sustainable Science & Technology

A new double flexible job-shop scheduling problem integrating processing time, green production, and human factor indicators

Guiliang Gong et al.

JOURNAL OF CLEANER PRODUCTION (2018)

Article Automation & Control Systems

A Collaborative Multiobjective Fruit Fly Optimization Algorithm for the Resource Constrained Unrelated Parallel Machine Green Scheduling Problem

Xiao-Long Zheng et al.

IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS (2018)

Article Computer Science, Interdisciplinary Applications

Bees Algorithm for multi-mode, resource-constrained project scheduling in molding industry

Ercan Oztemel et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2017)

Article Public, Environmental & Occupational Health

Safety Climate and Occupational Stress According to Occupational Accidents Experience and Employment Type in Shipbuilding Industry of Korea

Kyung Woo Kim et al.

SAFETY AND HEALTH AT WORK (2017)

Article Computer Science, Interdisciplinary Applications

Multi-mode resource constrained project scheduling under resource disruptions

Ripon K. Chakrabortty et al.

COMPUTERS & CHEMICAL ENGINEERING (2016)

Article Computer Science, Interdisciplinary Applications

A robust bi-objective model for concurrent planning of project scheduling and material procurement

Babak H. Tabrizi et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2016)

Article Computer Science, Interdisciplinary Applications

Energy-efficient dynamic scheduling for a flexible flow shop using an improved particle swarm optimization

Dunbing Tang et al.

COMPUTERS IN INDUSTRY (2016)

Article Management

Green scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption

S. Afshin Mansouri et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2016)

Article Computer Science, Interdisciplinary Applications

A genetic algorithm for permutation flow shop scheduling under make to stock production system

Humyun Fuad Rahman et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2015)

Article Management

A real-time order acceptance and scheduling approach for permutation flow shop problems

Humyun Fuad Rahman et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2015)

Article Engineering, Industrial

Tactical capacity planning in a real-world ETO industry case: An action research

Andrea Nunes Carvalho et al.

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2015)

Article Engineering, Industrial

Reduction of carbon emissions and project makespan by a Pareto-based estimation of distribution algorithm

Huan-yu Zheng et al.

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2015)

Review Green & Sustainable Science & Technology

Multi criteria decision making approaches for green supplier evaluation and selection: a literature review

Kannan Govindan et al.

JOURNAL OF CLEANER PRODUCTION (2015)

Article Computer Science, Interdisciplinary Applications

A variable iterated greedy algorithm with differential evolution for the no-idle permutation flowshop scheduling problem

M. Fatih Tasgetiren et al.

COMPUTERS & OPERATIONS RESEARCH (2013)

Article Engineering, Industrial

An Efficient PSO Algorithm for Finding Pareto-Frontier in Multi-Objective Job Shop Scheduling Problems

Warisa Wisittipanich et al.

INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS (2013)

Article Computer Science, Artificial Intelligence

A project scheduling approach to production and material requirement planning in Manufacturing-to-Order environments

Arianna Alfieri et al.

JOURNAL OF INTELLIGENT MANUFACTURING (2012)

Article Computer Science, Interdisciplinary Applications

An efficient memetic algorithm for solving the job shop scheduling problem

Liang Gao et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2011)

Article Engineering, Industrial

A project scheduling approach to production planning with feeding precedence relations

Arianna Alfieri et al.

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2011)

Article Engineering, Industrial

A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction

Kan Fang et al.

JOURNAL OF MANUFACTURING SYSTEMS (2011)

Article Management

A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem

Vincent Van Peteghem et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2010)

Article Engineering, Industrial

Modeling carbon footprints across the supply chain

Balan Sundarakani et al.

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2010)

Article Computer Science, Interdisciplinary Applications

The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects

Mario Vanhoucke et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2008)

Article Management

Two new robust genetic algorithms for the flowshop scheduling problem

R Ruiz et al.

OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE (2006)

Article Management

Experimental investigation of heuristics for resource-constrained project scheduling: An update

Rainer Kolisch et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2006)

Article Computer Science, Artificial Intelligence

A fast and elitist multiobjective genetic algorithm: NSGA-II

K Deb et al.

IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2002)

Review Management

An integrated survey of deterministic project scheduling

R Kolisch et al.

OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE (2001)

Article Computer Science, Artificial Intelligence

A heuristic genetic algorithm for subcontractor selection in a global manufacturing environment

DW Wang et al.

IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS (2001)

Article Automation & Control Systems

A multi-objective genetic algorithm for solving assembly line balancing problem

SG Ponnambalam et al.

INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2000)