4.7 Article

Sewerage infrastructure asset management based on a consumer-centric approach

期刊

ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH
卷 29, 期 35, 页码 53009-53021

出版社

SPRINGER HEIDELBERG
DOI: 10.1007/s11356-022-19347-z

关键词

Asset Management; Complaint; Consumer-driven; Flood control; Level of service; Sewerage infrastructure

资金

  1. Korea Environment Institute (KEI) [2018-071]
  2. National Research Foundation of Korea (NRF) - Korean Government (MSIT) [2019R1F1A1058948]
  3. National Research Foundation of Korea [2019R1F1A1058948] Funding Source: Korea Institute of Science & Technology Information (KISTI), National Science & Technology Information Service (NTIS)

向作者/读者索取更多资源

This study aims to define the appropriate target level of public infrastructure asset management by combining consumers' expected level of service and complaint data. The case of the inland flood management project in South Korea is investigated, and it is found that people want to allocate 25% of their current monthly sewage bill on the management project. The results also show that people prefer to address the problems caused by old service infrastructure at a lower cost during early stages.
In most developed countries, such as the USA, the E.U., and East Asia, the importance of public infrastructure asset management has been stressed for a long time. Among the various types of public infrastructure, sewerage systems are one of the most cost-intensive facilities to manage. Sewerage systems are considered highly difficult to manage due to the undetermined level of service needed, different standards of user satisfaction, and the large gap of service understanding between experts and users. To address these issues, this study aims to define the appropriate target level of service improvement by combining consumers' expected level of service and complaint data. In this study, the case of the inland flood management project in South Korea is investigated because of the global trend of increasing flood damage. The complaint data represent the frequency of flood damage in the area. Using the contingent valuation method, we found that people want to use 25% of their current monthly sewage bill on the management project. In addition, the results of this study demonstrate that people prefer to deal with the problems caused by old service infrastructure when it can be handled at a lower cost during early stages.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据