This paper presents a new framework for scheduling microgrids and distribution feeder reconfiguration, considering uncertainties from load demand, market price, and renewable power generation. The framework consists of a two-stage model, where the self-scheduling of microgrids is optimized in the first stage and the optimal configuration of the system is determined by the distribution system operator in the second stage. The results show that the deviation from optimal microgrid scheduling is significantly reduced when the system is reconfigured by the operator.
This paper presents a new framework for the scheduling of microgrids and distribution feeder reconfiguration (DFR), taking into consideration the uncertainties due to the load demand, market price, and renewable power generation. The model is implemented on the modified IEEE 118-bus test system, including microgrids and smart homes. The problem has been formulated as a two-stage model, which at the first stage, the day-ahead self-scheduling of each microgrid is carried out as a two-objective optimization problem. The two objectives include the minimization of the total operating cost and maximization of the consumer's comfort index. Then, the solution, obtained from the first stage is delivered to the distribution system operator (DSO). Then, at the second stage, the DSO determines the optimal configuration of the system with the aim of minimizing operating costs of the main grid and the penalty of deviating from microgrid scheduling. Note that the penalty is due to the difference in power exchange requested by the microgrids from the power exchange finalized by the DSO. The presented two-stage optimization problem is modeled in a mixed-integer linear programing (MILP) framework with four case studies, and solved in GAMS by using the GURUBI solver. The simulation results show that in the cases the DSO is able to reconfigure the system, the deviation from the optimal scheduling of microgrids would be considerably lower than the cases with fixed system configuration. (c) 2022 Elsevier Ltd. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据