4.5 Article

Uncertainty and modelling cost based methodology for modelling choices in multiscale structures

期刊

CIRP ANNALS-MANUFACTURING TECHNOLOGY
卷 71, 期 1, 页码 129-132

出版社

ELSEVIER
DOI: 10.1016/j.cirp.2022.04.058

关键词

Design method; Uncertainty; Multiscale modelling

向作者/读者索取更多资源

Choices in the design phases of multiscale structures are guided by integration of knowledge on parameters at different scales, and this work aims to rationalize modeling costs by considering uncertainties and controlling parameter uncertainties at the structure scale.
Choices made in the design phases of multiscale structures are guided by the integration of knowledge on parameters at different scales of observation of the structure. These choices are often based on many experimental and predictive campaigns which increase modelling costs. The work developed here integrates the consideration of uncertainties in order to rationalise the cost of modelling (predictive and experimental) while controlling uncertainty over those parameters that are of interest for the structure scale. The methodology is applied to the study of a thick composite pressure vessel to be used for hydrogen storage.(c) 2022 CIRP. Published by Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据