A graph-based approach for unpacking construction sequence analysis to evaluate schedules

期刊

ADVANCED ENGINEERING INFORMATICS
卷 52, 期 -, 页码 -

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.aei.2022.101625

关键词

Construction schedules; Construction sequences; Graph-based classification

资金

  1. InnovateUK [104795]
  2. Innovate UK [104795] Funding Source: UKRI

向作者/读者索取更多资源

Construction schedules are crucial for project success, but they often require experienced schedulers. This study proposes a graph-based method to find the most time-efficient construction sequence from historic projects, improving scheduling productivity and accuracy. Results indicate that earthwork sequences are the least time-efficient and frequent sequences learned from past projects are closer to the actual schedule.
Construction schedules can mitigate delay risks and are essential to project success. Yet, creating a quality construction schedule is often the outcome of experienced schedulers, and what makes it harder is the fact that historic information including decision reasoning was not documented and disseminated for future use. This study proposes a graph-based method to find the most time-efficient construction sequence from historic projects to improve scheduling productivity and accuracy. The proposed method captured the textual, numerical, and graphical features of construction schedules, and was validated on 353 construction schedules obtained from a Tier-1 contractor in the UK. The results indicate that earthwork sequences can be finished in 4.0% of the project time on average, but earthwork sequences are the least time-efficient ones in a construction project (29% delayed), particularly in road construction (88% delayed). This study compared the time efficiency of sequences learned from previous projects with case study sequences. Results indicated that frequent sequences learned from past projects are 26.7% closer to the actual schedule than the planned ones. Results of this study could assist inexperienced schedulers to create more quality construction schedules and project managers to benchmark project performances.