4.7 Article

Computational method for optimal machine scheduling problem with maintenance and production

期刊

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 55, 期 6, 页码 1791-1814

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2016.1245451

关键词

maintenance and production; optimal scheduling; optimal control; smoothing technique; improved Newton algorithms

资金

  1. Chinese National Natural Science Foundation [61563011, 11501143, 61374006]
  2. Ph.D research fund of Guizhou Normal University [11904-0514170]

向作者/读者索取更多资源

This paper considers an optimal scheduling problem of maintenance and production for a machine. Firstly, the problem is formulated as a stochastic switched impulsive optimal control problem. However, there exists the stochastic disturbance in this model. Thus, it is difficult to solve the problem by conventional optimisation techniques. To overcome this difficulty, the stochastic switched impulsive optimal control problem is transformed into a deterministic switched impulsive optimal control problem with continuous state inequality constraints. Then, by combining a time-scaling transformation, a second-order smoothing technique and a penalty function method, an improved Newton algorithm is developed for solving this problem. Convergence results indicate that the algorithm is globally convergent with quadratic rate. Finally, two numerical examples are provided to illustrate the effectiveness of the developed algorithm.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据