Overlapping of natural stone mining field with high-speed train project in Turkey: Was the economic public benefit evaluation made sufficiently?

期刊

RESOURCES POLICY
卷 74, 期 -, 页码 -

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.resourpol.2021.102241

关键词

Cost benefit analysis; Investment; Land use; Mining operation; Mining project; Mining reserve

向作者/读者索取更多资源

Unlike many other land uses, mineral extraction is limited by geographic location, with mines having to be produced on-site, leading to overlaps with other land uses. In the case of an overlap between a natural stone operation site and a high-speed train project, the Audit On-Site Committee decided in favor of prioritizing the high-speed train project after considering economic public benefits.
Unlike many other land uses, the area on which mineral extraction can be done is limited. The fact that the mines have to be produced where they exist without being able to choose a location brings along other benefits and area usage overlaps. A remarkable example of a mining-infrastructure investment overlap is the overlap between a natural stone operation site and a high-speed train project in Nevsehir. The Audit On-Site Committee examined the overlapping mine sites. Based on the report of the Committee, it was decided in favor of the railway activity. In this report, it was detected that mining activities can be conducted on the condition that mining operating license area is reduced due to the high-speed train line. Yet, a significant part of mine production area overlapped with the high-speed train line. Following the evaluations made considering the economic public benefit, it was decided that the high-speed train project should be given priority in the overlapping area. In these evaluations, it was taken into consideration that the contribution of high-speed train investment to the area would be higher compared to mining investment and that shifting the project towards another area would be more costly. In this study, the economic public interest evaluation made by the Committee is discussed in terms of the methods that should be applied in cost-benefit analysis. It was determined that a practical but non-exhaustive method was applied in the cost-benefit analysis, which is the basis for the economic public interest evaluation made by the committee. To see the application more clearly, the deficiencies in the calculation made by the Committee are completed. This calculation and method application by the Committee were compared with the methods that should be applied in cost-benefit analysis. These kinds of investment overlaps may cause project route alterations in the billion-dollar infrastructure investments. Solutions were offered on the subject of Audit On-Site Committee evaluations, which were effective in this, across Turkey.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据