ENERGY REPORTS
卷 7, 期 -, 页码 38-47出版社
ELSEVIER
DOI: 10.1016/j.egyr.2021.08.149
关键词
Series PIR; Shunt PIR; SF6 circuit breakers; Operation reliability; Fault diagnosis
资金
- Science and Technology Project of State Grid Ningxia Electric Power Co., China [5229DK200057]
Pre-insertion resistors (PIR) are critical components for suppressing inrush current and overvoltage during circuit breaker closing, especially in high voltage transmission lines. However, there is currently no systematic method for analyzing defects and causes of failure in PIR.
Pre-insertion resistors (PIR) are critical components for suppressing the closing inrush current and operating overvoltage during the closing process of the circuit breaker. And it is widely adopted in 800kV and above transmission lines and alternating current filters of converter substations. These special application environments lead to higher failure rates than other electrical components. However, in the daily operation and fault diagnosis of PIR, there is no systematic method to analyze whether there are defects in PIR and the cause of failure after the PIR fails. Based on two PIR failure in series and parallel structures, this paper proposes methods such as dynamic resistance fitting, acoustic and vibration signal detection, insulation performance test, and heat capacity test during operation. In the aspect of fault diagnosis, methods such as PIR splicing based on Iterative Closest Point, stress analysis, and electric field simulation are proposed. Finally, proposed methods can be adjusted to estimate the operating state of PIR through the disassembly inspection to avoid the GIS breakdown accident during the operation of the circuit breaker. (C) 2021 The Author(s). Published by Elsevier Ltd.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据