期刊
FORESTS
卷 13, 期 2, 页码 -出版社
MDPI
DOI: 10.3390/f13020290
关键词
AHP; BWM; group decision-making; urban park assessment
类别
资金
- Ministry of Education, Science, and Technological Development of Serbia [451-03-68/2020-14/200117]
This paper compares two multi-criteria methods, the analytic hierarchy process (AHP) and the best-worst method (BWM), in assessing criteria related to the quality of urban parks. The study found that there were similarities in the evaluation results after applying the two different decision support methods, indicating a high consistency between experts during the cognitive evaluation processes. All applied aggregation schemes performed well and may be considered trustworthy in identifying the group solution.
The paper compares two multi-criteria methods, the analytic hierarchy process (AHP) and the best-worst method (BWM), in assessing criteria related to the quality of urban parks. The criteria assessed were accessibility, location, biodiversity preservation, park equipment, water elements, terrain configuration, cultural and historical value, and the presence of small architectural objects. Five decision-makers participated in the research, having expertise in urban greenery, urban forestry, environmental protection, landscape design, and cultural and historical heritage. The results of decision-makers' evaluations were compared at individual and group levels after the application of three aggregation procedures: CRITIC, ENTROPY, and WGGM (weighted geometric mean method). Similarities in results, i.e., priorities of analyzed criteria after applying the two different decision support methods, indicated high consistency between experts during the cognitive evaluation processes. All applied aggregation schemes performed well and may be considered trustworthy in identifying the group solution. One of the conclusions is that either the AHP or the BWM can be efficiently used in evaluations of criteria for assessing the quality of urban parks if the members of a group are consistent, regardless of whether the consensus process is properly carried out before the decision-making process.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据