期刊
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY
卷 120, 期 -, 页码 -出版社
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.tust.2021.104283
关键词
Limerick tunnel; Immersed tunnel; Drydock in approaches; Casting basin alternative
The paper discusses the construction of the Limerick Tunnel using the immersed tunnel technique and the challenges faced due to poor ground conditions and tidal river currents.
The Limerick Tunnel was constructed using the immersed tunnel technique in an 'in-line' casting basin or drydock within the footprint of the northern approach structures. The paper describes the benefits of this method of construction, the temporary works required to form the elements under challenging environmental conditions, namely poor ground conditions and a tidal river subject to large water level variation and strong currents.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据