4.5 Article

Steam conformance investigation of flow control devices deployed in SAGD injection and production horizontal wells

期刊

出版社

ELSEVIER
DOI: 10.1016/j.petrol.2021.108907

关键词

Steam-assisted gravity drainage; Coupled model; FCD; Horizontal wells; Steam chamber uniformity; Heavy oil

资金

  1. National Science and Technology Major Project [2016ZX05031-002]
  2. National Natural Science Foundation of China [51604293, 51704190]
  3. Fundamental Research Funds for the Central Universities [17CX02009A]

向作者/读者索取更多资源

This paper investigates the impact of tubing-deployed Flow Control Devices (FCDs) on steam conformance in a Steam Assisted Gravity Drainage (SAGD) well pair. It was found that FCDs can significantly improve steam conformance over time, highlighting the importance of adjusting the FCD open flow area design dynamically for maintaining steam conformance and enhancing oil recovery in the long term.
The nonuniformity of the steam chamber has a significant influence on oil recovery in the process of SteamAssisted Gravity Drainage (SAGD). To improve steam conformance, Flow Control Devices (FCDs) are generally installed in both the SAGD injector and producer. In this paper, we investigated the steam conformance of tubing-deployed FCDs in a SAGD well pair. First, a three-phase, three-dimensional reservoir model was developed. Then, a wellbore model for saturated steam flow in the FCD equipped injector and oil/water flow in the FCD equipped producer was proposed. Next, the reservoir and wellbore models were coupled and solved fully implicitly. Finally, after model validations, the effects of the steam injection mode, FCD parameters, steam injection parameters and reservoir geological properties on the conformance of the steam chamber were studied. The results showed that tubing-deployed FCDs were obviously better at improving the steam conformance than the simultaneous dual-tubing string injection technique and injecting steam at only a single point. The steam chamber conformance increased with a decrease in steam injection pressure and reservoir permeability and an increase in steam quality and oil saturation. The steam chamber uniformity gradually declined with time. To maintain the steam conformance over the life of the SAGD and ultimately oil recovery, the FCD open flow area design in SAGD wells should be adjusted at different injection times. When the FCD open flow area was small in the part with high permeability and large in the part with low permeability, a high degree of steam conformance and greater amount of cumulative oil production could be obtained.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据