IET RENEWABLE POWER GENERATION
卷 10, 期 3, 页码 399-409出版社
INST ENGINEERING TECHNOLOGY-IET
DOI: 10.1049/iet-rpg.2015.0176
关键词
offshore installations; wind power plants; power generation dispatch; particle swarm optimisation; cost reduction; optimised power dispatch strategy; offshore wind farms; levelised production cost minimization; particle swarm optimisation; PSO; irregular shape wind farm
资金
- Norwegian Centre for Offshore Wind Energy (NORCOWE) from Research Council of Norway (RCN) [193821/S60]
Maximising the power production of offshore wind farms using proper control strategy has become an important issue for wind farm operators. However, the power transmitted to the onshore substation is not only related to the power production of each wind turbine but also the power losses which are related to electrical system topology. This study proposed an optimised power dispatch strategy for minimising the levelised production cost of a wind farm. Particle swarm optimisation (PSO) is employed to obtain final solution for the optimisation problem. Both regular shape and irregular shape wind farm are chosen for the case study. The proposed dispatch strategy is compared with two other control strategies. The simulation results show the effectiveness of the proposed strategy.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据