期刊
INTERNATIONAL JOURNAL OF PAVEMENT ENGINEERING
卷 23, 期 13, 页码 4803-4818出版社
TAYLOR & FRANCIS LTD
DOI: 10.1080/10298436.2021.1978442
关键词
Pavement condition; road asset management; Building Information Modelling; pavement maintenance; pavement attributes
类别
资金
- Consorzio Autostrade Siciliane
- Autodesk, Inc.
The article discusses the challenges of data management arising from the increasing capability for road pavement condition inspections in recent years. It proposes a solution for presenting and elaborating pavement condition information in an I-BIM environment and tests its preliminary effectiveness on an existing highway.
In recent years, the growing survey capability for continuous and frequent inspections of road pavement conditions has raised questions regarding the optimal solutions for data management. Considering traditional approaches, classical Pavement Management Systems seem inadequate for exploiting the potential of similar data, especially for visualization and infrastructure modelling. The development of BIM procedures may be helpful although the existing solutions are not ready for handling road condition and maintenance management. Furthermore, the recent international regulations gradually adopt BIM in all infrastructure projects, as reference model. Then, as a preliminary approach, in this paper, a solution for presenting and elaborating pavement condition information in an I-BIM environment is proposed. This procedure simplifies representation and elaboration of survey information regarding structural and functional conditions of pavements in a realistic 3D environment, exploiting smart object potential. Specific routines have been coded for upgrading and elaborating specific extended attributes related to pavement condition. This approach represents an important evolution compared to traditional methodologies, as a modern and 'user-friendly' decision support tool for road agencies, combining in a single environment all the life cycle phases of the infrastructure. The proposed approach has been tested, in a preliminary form, on an existing motorway, with positive results.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据