期刊
IEEE TRANSACTIONS ON POWER SYSTEMS
卷 36, 期 6, 页码 5235-5244出版社
IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2021.3069781
关键词
Voltage control; Regulation; Capacitors; Batteries; Stochastic processes; Load modeling; Programming; Battery energy storage system (BESS); co-optimization; distributed generator (DG); peak shaving; two-stage stochastic programming; voltage regulation
资金
- U.S. Department of Energy Wind Energy Technologies Office [DE-EE0008956]
- National Science Foundation [ECCS 1929975]
This paper introduces a co-optimization framework that optimizes the cooperation between distributed generators, battery energy storage systems, and voltage regulating devices to achieve integrated peak shaving and voltage regulation in distribution grids.
This paper considers the co-operation of distributed generators (DGs), battery energy storage systems (BESSs) and voltage regulating devices for integrated peak shaving and voltage regulation in distribution grids through a co-optimization framework, which aims to minimize the operational costs while fulfilling the operational constraints of network and devices. To account for the uncertainties of load demand and generation, we then convert the co-optimization model into a two-stage stochastic program where state-of-charge (SoC) trajectories of BESSs and operation of voltage regulating devices are optimized at the first stage for day-ahead scheduling, while the reactive powers of DGs and BESSs are left at the second stage for potential intra-day scheduling to handle short-term voltage issues. The proposed co-optimization scheme is validated on the IEEE 37-node test feeder and compared with other practices.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据