4.7 Article

Green hydrogen & electricity production via geothermal-driven multi-generation system: Thermodynamic modeling and optimization

期刊

FUEL
卷 308, 期 -, 页码 -

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.fuel.2021.122049

关键词

Geothermal energy; PEM electrolyzer; Organic Rankine cycle; Absorption refrigeration; Hydrogen; Exergy

向作者/读者索取更多资源

The study proposed a multi-generation system driven by geothermal energy, which incorporates multiple subsystems and was optimized for efficiency, serving as a promising solution to support energy needs of a significant number of households.
Concerning limited sources of fossil fuels, humankind should ensue new avenues to meet its energy demands. Towards this, geothermal energy is acknowledged as a promising, reliable, safe, and clean means for this aim. In the present study, a multi-generation system driven by geothermal energy, which produces electrical power, hydrogen, oxygen, and cooling, is proposed, appraised from thermodynamic and economic standpoints. Due to today's importance of hydrogen production, pure hydrogen production is one of the primary purposes of the system here described and analyzed. The subsystems include an organic Rankine cycle (ORC), a polymer electrolyte membrane (PEM) electrolyzer, and a lithium/bromide absorption refrigeration cycle. The model is implemented in the Engineering Equation Solver software and a multi-objective optimization is performed with NSGA-II. The results indicate that the parameters mostly affecting system performance include geothermal fluid mass flow rate, geothermal fluid temperature, ORC turbines inlet temperature, and evaporator pinch-point. The highest exergy destruction is pertinent to evaporators and the PEM electrolyzer, respectively. Moreover, the results reveal that the higher the geothermal well temperature, the higher the output parameters of the system. Also, a case study was carried out to implement the proposed system in Sabalan geothermal wells; the results indicate that the system can support the energy need of 160 families during one year by producing 4,696 MWh of electrical power. Lastly, the multi-objective optimization lead to a optimal scenario with 37.85 % exergy efficiency and 15.09 USD/h system cost rate.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据