4.6 Article

Laboratory investigation on erosion threshold shear stress of cohesive sediment in Karkheh Dam

期刊

ENVIRONMENTAL EARTH SCIENCES
卷 80, 期 19, 页码 -

出版社

SPRINGER
DOI: 10.1007/s12665-021-09984-x

关键词

Critical shear stress; Sediment; Erosion; Dam

资金

  1. Research Office of Khuzestan Regional Water and Energy organization, Ahwaz, Iran

向作者/读者索取更多资源

This research focuses on understanding the dynamic behavior of fine-sticky sediments in the development and maintenance of reservoirs and water transfer networks for the Karkheh dam reservoir management. The results show that the concentration of eroded sediments is a function of time for the consolidation of reservoir sediment, and the duration of consolidation time is an effective factor on critical erosion shear stress. Erosion rate suggests an inverse relationship with the life of the settled sediments, indicating that the best flow shear stress for sediment removal from the Karkheh dam reservoir should be greater than 0.31 N/m(2).
The awareness of the transmission of the sticky sediments for the development and maintenance of reservoirs and water transfer network is very important. This research was carried out to recognize and understand the dynamic behavior of fine-sticky sediments to obtain the necessary information for the Karkheh dam reservoir management. Sediment samples were taken from the four different points located in the dam reservoir. Liquidity and plasticity behaviors and their indices of the samples that were combined together were determined by doing the Atterberg limits experiment. To investigate the initial erosion threshold shear stress, the impact of consolidation and sediment depth were examined by cylindrical settling columns. Using a circular flume in, Shahrekord University Lab, the concentration process, changes of eroded sediments, shear stress threshold of erosion, erosion rates, etc. in different consolidation periods (3, 14 and 30 days) were studied. The results showed that the concentration of eroded sediments is a function of time for the consolidation of reservoir sediment and bed shear stress and also observed that the duration of consolidation time is an effective factor on critical erosion shear stress. So, the threshold shear stress values for consolidation time of 3, 14 and 30 days were, 0.16, 0.22, 0.31 N/m(2), respectively. The results of the erosion rate suggest an inverse relationship between this parameter and the life of the settled sediments based on the results the best flow shear stress for sediment removal by flashing from the Karkheh dam reservoir should be greater than 0.31 N/m(2).

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据