4.5 Article

Prioritization of Contracting Methods for Water and Wastewater Projects Using the Fuzzy Analytic Hierarchy Process Method

期刊

ENERGIES
卷 14, 期 22, 页码 -

出版社

MDPI
DOI: 10.3390/en14227815

关键词

fuzzy analytic hierarchy process; construction contract; water; wastewater; Iran

向作者/读者索取更多资源

This study prioritizes contracting methods for water and wastewater projects in Iran using the FAHP method, determining that the bilateral, cooperative, and trilateral contracting methods are most suitable. The study offers useful guidance for project firms in selecting the optimal contracting method.
This study uses the fuzzy analytical hierarchy process (FAHP) method to prioritize contracting methods to determine the most suitable contract option for water and wastewater projects (WWP). Content analysis, a two-round Delphi survey technique, and a series of validation and reliability tests helped establish the 18 key criteria for FAHP analysis. Consequently, data collected from experts through a pairwise comparison questionnaire form the basis for the inputs for the FAHP analysis. Consequently, the final weightings were derived for each of the key criteria and available contracting methods. The results indicate that the bilateral, cooperative, and trilateral contracting methods are the most suitable for WWP in Iran, with the highest weighting. The study provides useful guidance for the top management of project firms in selecting the optimal contracting method for their projects and offers significant contributions from theoretical and practical perspectives.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据