4.7 Article

A fatigue-conscious dual resource constrained flexible job shop scheduling problem by enhanced NSGA-II: An application from casting workshop

期刊

COMPUTERS & INDUSTRIAL ENGINEERING
卷 160, 期 -, 页码 -

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cie.2021.107557

关键词

Dual resource constrained flexible job shop; scheduling problem; Multi-objective optimization; Worker fatigue; Initialization method; Neighborhood structure; Casting workshop

资金

  1. National Key R & D Program of China [2018YFB1308200]
  2. National Natural Science Foundation of China [62073127]
  3. Open Program of Hunan Provincial Key Laboratory of Vehicle Power and Transmission System, China [VPTS202002]

向作者/读者索取更多资源

A solution for fatigue-conscious dual resource constrained flexible job shop scheduling problem is proposed, aiming to relieve worker fatigue and enhance productivity through joint scheduling of machines and workers.
Dual resource constrained flexible job shop scheduling problem (DRCFJSP) becomes a hot research topic in recent years. However, worker fatigue is barely considered in DRCFJSP, which will result in unsuitable task assignments for workers and bring about negative effects such as muscle fatigue and cognitive confusion. To this end, a fatigue-conscious DRCFJSP is proposed in this paper, aiming at simultaneously relieving fatigue and promoting productivity by joint scheduling of machines and workers. A multi-objective optimization model is constructed to minimize the maximum worker fatigue and makespan. Furthermore, an enhanced NSGA-II (ENSGA) is developed in this paper to cope with the proposed problem. In the ENSGA, four dispatch rules are designed to generate high-quality solutions at the initialization stage. Two neighborhood structures based on a novel method of defining the critical path are designed to strengthen the ability of local search. Finally, with the comprehensive experiments on extensive test instances and a case study from real-world casting workshop, the effectiveness of proposed ENSGA for solving the fatigue-conscious DRCFJSP is verified, and the significance of the proposed joint scheduling approach is elucidated. This work renders the decision-maker practical and effective scheduling with fatigue-conscious for the machine and worker constrained flexible manufacturing system.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据