期刊
BIORESOURCE TECHNOLOGY
卷 337, 期 -, 页码 -出版社
ELSEVIER SCI LTD
DOI: 10.1016/j.biortech.2021.125434
关键词
Domestic wastewater; Pre-anaerobic treatment; Partial nitrification start-up; Anammox; Advanced nitrogen removal
资金
- Foundation for Innovative Research Groups of the National Natural Science Foundation of China [62021003]
- 111 Project [D16003]
This study demonstrated the feasibility of starting and maintaining partial nitrification through pre-anaerobic treatment, as well as the feasibility of nitrogen removal by coupling simultaneous nitrification-denitrification with anammox to treat actual municipal sewage.
A modified two-stage partial nitrification/anammox (PN/A) process with short aerobic HRT of 5.7 h was established and realized advanced nitrogen removal from domestic wastewater. The first process was partial nitrification in the PN-SBR, the initiation and stable maintenance of partial nitrification was achieved by preanaerobic treatment without inoculation or addition of inhibitor, nitrite accumulation rate was over 90% and maintained over 200 days, meanwhile pre-anaerobic improved the storage of endogenous carbon sources to enhance the nitrogen removal efficiency. The second process was anammox in the AMX-SBR, which was fed with the effluent of PN-SBR, the effluent total inorganic nitrogen was below 5 mgN/L, nitrogen removal efficiency reached 92.06%. Furthermore, Candidatus-Brocadia was enriched after treating domestic sewage with low ammonia from 0.02% to 0.23%.This study demonstrated the feasibility of starting and maintaining partial nitrification by pre-anaerobic treatment and the feasibility of nitrogen removal by coupling simultaneousnitrification-denitrification with anammox to treat actual municipal sewage.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据