4.8 Article

Robust strategic planning of dynamic wireless charging infrastructure for electric buses

期刊

APPLIED ENERGY
卷 307, 期 -, 页码 -

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.apenergy.2021.118243

关键词

Battery electric bus; Electromobility; Vehicle scheduling; Dynamic wireless charging; Robust optimization

向作者/读者索取更多资源

This study aims to address the limitations of battery electric buses (BEBs) in terms of charging time and driving range by utilizing dynamic wireless charging (DWC) technology, and to improve their application in public bus systems. The research analyzes the benefits of joint planning of charging infrastructure and fleet scheduling in a bus network based on Binghamton University using robust planning models.
Electromobility in public bus systems is growing rapidly and experiencing a fundamental transformation in their infrastructure and operations. The dilemma of limited driving range and charging time of battery electric buses (BEBs) hinders their adoption. A novel approach to address BEB limitations is to utilize dynamic wireless charging (DWC) technology that allows buses to charge while in motion. This paper aims to analyze robust strategic planning of DWC and BEB fleet scheduling based on a real bus network at Binghamton University. The problem is first formulated as a new deterministic mixed-integer linear programming model to simultaneously optimize both the charging planning problem and fleet scheduling problem in an integrated fashion. To address the uncertainty of energy demand and charging time, a robust counterpart model (RCM) has been derived. To increase RCM flexibility, the battery status variable is formulated in a cumulative form. Dependent and independent budget uncertainty sets have been developed to control the robustness. A sensitivity analysis has been conducted to study the system behavior in response to different charging types, auxiliary energy demand, depth of discharge, charging options at terminals, battery degradation, and electricity cost. The deterministic model shows that eight homogeneous BEBs are required to operate on the selected routes with a battery capacity of 54.01 kWh and a total cost of $3,636,347. The results show that joint planning of charging infrastructure and fleet scheduling can save 19.2% of total cost compared to disjoint planning. The RCM results in 10 BEBs to ensure feasiblility against uncertainty.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据