A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects

相关参考文献

注意:仅列出部分参考文献,下载原文获取全部文献信息。
Article Management

Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time-cost-quality-safety trade-off in construction projects

Kamal Sharma et al.

Summary: This study focuses on the development of a multi-objective optimization model that combines time, cost, quality, and safety. They use a multimode resource-constrained approach and employ a meta-heuristics algorithm along with other methods to develop the model. By conducting a case study on a building construction project, they demonstrate the applicability of the model and validate its effectiveness through measurements of various performance metrics and comparisons with existing models.

INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT (2022)

Article Management

Generation, visualization, and evaluation schedule of repetitive construction projects using GIS

Anjul Tomar et al.

Summary: This study uses geographic information systems (GIS) to consider the effects of surroundings on the schedule of a repetitive construction project and develops an interactive tool for scheduling. By linking the schedule with related 3D components, the constructability of the developed schedule can be checked and logical errors and missing activities can be identified. The developed tool is applied in the scheduling of Udaigiri boys hostel (UBH) building.

INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT (2022)

Article Management

Developing an optimization financing cost-scheduling trade-off model in construction project

Mehdi Tavakolan et al.

Summary: Time-cost trade-off analysis is a challenging task for construction project planners, and this study presents a hybrid meta-heuristic algorithm to solve the problem. The algorithm is validated and applied to case studies, demonstrating its superiority over existing models in finding better solutions with lower total project duration and cost.

INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT (2022)

Article Engineering, Industrial

Time-cost-quality trade-off analysis for planning construction projects

Tianqi Wang et al.

Summary: This paper aims to analyze trade-offs among project objectives of time, cost, and quality in construction projects. The optimization model developed in this study identifies various solutions for construction managers to achieve project goals efficiently.

ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT (2021)

Article Engineering, Industrial

Work continuity constraints in repetitive project scheduling considering soft logic

Xin Zou et al.

Summary: This study introduces a new mathematical programming model based on soft logic for scheduling repetitive projects, aiming to optimize three conflicting objectives simultaneously, providing more flexibility for project scheduling.

ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT (2021)

Article Computer Science, Artificial Intelligence

A competitive mechanism integrated multi-objective whale optimization algorithm with differential evolution q

Nianyin Zeng et al.

Summary: The paper proposes a competitive mechanism integrated whale optimization algorithm (CMWOA) for multi-objective optimization problems. By introducing a novel competitive mechanism and improving the calculation of crowding distance, the convergence and accuracy of the algorithm are enhanced. Additionally, concatenating differential evolution (DE) into the population with different adjusting strategies for key parameters further improves the overall performance.

NEUROCOMPUTING (2021)

Article Management

Presenting a goal programming model in the time-cost-quality trade-off

Nima Hamta et al.

Summary: Time, cost and quality are important objectives of each project. The most commonly used approach is the balancing method to achieve these objectives. A goal programming model is developed in this paper to manage the cost, time and quality of the project.

INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT (2021)

Article Construction & Building Technology

A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic

Xin Zou et al.

AUTOMATION IN CONSTRUCTION (2020)

Article Computer Science, Artificial Intelligence

A guided population archive whale optimization algorithm for solving multiobjective optimization problems

Adel Got et al.

EXPERT SYSTEMS WITH APPLICATIONS (2020)

Article Construction & Building Technology

New Approach to Improve General Contractor Crew's Work Continuity in Repetitive Construction Projects

Michal Tomczak et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2020)

Article Engineering, Civil

A Fixed Start Scheduling Approach for Repetitive Construction Projects

Francisco Moreno et al.

KSCE JOURNAL OF CIVIL ENGINEERING (2020)

Review Computer Science, Artificial Intelligence

Whale optimization algorithm: a systematic review of contemporary applications, modifications and developments

Nadim Rana et al.

NEURAL COMPUTING & APPLICATIONS (2020)

Article Engineering, Civil

MULTI-OBJECTIVE SYMBIOTIC ORGANISMS OPTIMIZATION FOR MAKING TIME-COST TRADEOFFS IN REPETITIVE PROJECT SCHEDULING PROBLEM

Duc-Hoc Tran et al.

JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT (2019)

Article Computer Science, Artificial Intelligence

A hyper-heuristic for improving the initial population of whale optimization algorithm

Mohamed Abd Elaziz et al.

KNOWLEDGE-BASED SYSTEMS (2019)

Article Engineering, Civil

Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects

Gholamreza Heravi et al.

KSCE JOURNAL OF CIVIL ENGINEERING (2019)

Article Construction & Building Technology

Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost

Ayman Altuwaim et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2018)

Article Construction & Building Technology

Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost

Ayman Altuwaim et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2018)

Article Computer Science, Interdisciplinary Applications

The Whale Optimization Algorithm

Seyedali Mirjalili et al.

ADVANCES IN ENGINEERING SOFTWARE (2016)

Article Computer Science, Interdisciplinary Applications

A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem

Hamidreza Maghsoudlou et al.

COMPUTERS & CHEMICAL ENGINEERING (2016)

Article Engineering, Civil

MULTIOBJECTIVE OPTIMIZATION MODEL FOR SCHEDULING OF CONSTRUCTION PROJECTS UNDER EXTREME WEATHER

Ahmed B. Senouci et al.

JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT (2016)

Article Construction & Building Technology

Repetitive Scheduling Method: Requirements, Modeling, and Implementation

Photios G. Ioannou et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2016)

Article Construction & Building Technology

Repetitive Scheduling Method: Requirements, Modeling, and Implementation

Photios G. Ioannou et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2016)

Article Construction & Building Technology

Multi-objective genetic optimization for scheduling a multi-storey building

Fatma A. Agrama

AUTOMATION IN CONSTRUCTION (2014)

Article Computer Science, Interdisciplinary Applications

A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations

Elham Nabipoor Afruzi et al.

COMPUTERS & OPERATIONS RESEARCH (2014)

Article Engineering, Industrial

Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization

Lianying Zhang et al.

JOURNAL OF MANAGEMENT IN ENGINEERING (2014)

Article Construction & Building Technology

GA optimization model for repetitive projects with soft logic

Su-Ling Fan et al.

AUTOMATION IN CONSTRUCTION (2012)

Article Construction & Building Technology

Optimizing linear project scheduling with multi-skilled crews

Shu-Shun Liu et al.

AUTOMATION IN CONSTRUCTION (2012)

Article Computer Science, Artificial Intelligence

A multi-objective artificial bee colony algorithm

Reza Akbari et al.

SWARM AND EVOLUTIONARY COMPUTATION (2012)

Article Construction & Building Technology

Fuzzy-multi-objective particle swarm optimization for time-cost-quality tradeoff in construction

Hong Zhang et al.

AUTOMATION IN CONSTRUCTION (2010)

Article Engineering, Electrical & Electronic

Environmental/economic power dispatch problem using multi-objective differential evolution algorithm

L. H. Wu et al.

ELECTRIC POWER SYSTEMS RESEARCH (2010)

Article Computer Science, Artificial Intelligence

Multi-objective self-adaptive differential evolution with elitist archive and crowding entropy-based diversity measure

Yao-Nan Wang et al.

SOFT COMPUTING (2010)

Article Construction & Building Technology

A genetic algorithm-based method for scheduling repetitive construction projects

Luong Duc Long et al.

AUTOMATION IN CONSTRUCTION (2009)

Article Construction & Building Technology

Resource-constrained scheduling for continuous repetitive projects with time-based production units

Machine Hsie et al.

AUTOMATION IN CONSTRUCTION (2009)

Article Automation & Control Systems

Reserve-constrained multiarea environmental/economic dispatch based on particle swarm optimization with local search

Lingfeng Wang et al.

ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE (2009)

Article Construction & Building Technology

Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects

A. Samer Ezeldin et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2009)

Article Business

Automated trade-off between time and cost in planning repetitive construction projects

Khalied Hesham Hyari et al.

CONSTRUCTION MANAGEMENT AND ECONOMICS (2009)

Article Construction & Building Technology

Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis

I-Tung Yang

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2007)

Article Construction & Building Technology

Non-unit-based planning and scheduling of repetitive construction projects

Rong-Yau Huang et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2006)

Article Construction & Building Technology

System development for non-unit based repetitive project scheduling

R Huang et al.

AUTOMATION IN CONSTRUCTION (2005)

Article Construction & Building Technology

Time-cost-quality trade-off analysis for highway construction

K El-Rayes et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2005)

Review Computer Science, Artificial Intelligence

Performance assessment of multiobjective optimizers: An analysis and review

E Zitzler et al.

IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2003)

Article Construction & Building Technology

Comparison of linear scheduling model and repetitive scheduling method

KG Mattila et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2003)

Article Computer Science, Artificial Intelligence

A fast and elitist multiobjective genetic algorithm: NSGA-II

K Deb et al.

IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2002)

Article Construction & Building Technology

Cost optimization in projects with repetitive nonserial activities

T Hegazy et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2001)

Article Construction & Building Technology

Optimizing resource utilization for repetitive construction projects

K El-Rayes et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2001)