A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects

期刊

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/15623599.2021.1938939

关键词

Time-cost-quality tradeoffs; construction management; multiple objective; repetitive project; whale optimization

向作者/读者索取更多资源

Project managers aim to complete projects with the shortest time, lowest cost, and highest quality. This study proposes a free-parameter multiple objective optimization method to tradeoff time, cost, and quality in non-unit repetitive projects.
Project managers are the ones who struggle to complete the project with the shortest possible time, the least amount of costs and, the highest quality. The primary objective in the planning stage of the project management process is to identify the most suitable schedule from provided time-cost-quality curve. Scheduling of construction repetitive projects assumes the same production and hard logic between units. This study proposes a free-parameter multiple objective whale optimization (MOWO) to tradeoff the time, cost and, quality factors in non-unit repetitive projects (NRP). An external scheduling system shall consider project activities dependencies, multiple crew assignments, and soft logic in units to calculate project duration, cost and, quality. A construction case study was used to examine MOWO performance. Furthermore, some broadly recognized multiple objective evolutionary algorithms are employed to compare with the proposed algorithm. Result comparison points out that MOWO attained the best optimization outcomes in handling the time-cost-quality tradeoff in non-unit repetitive construction projects.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.9
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据