ADVANCES IN CIVIL ENGINEERING
卷 2021, 期 -, 页码 -

出版社

HINDAWI LTD
DOI: 10.1155/2021/3007807

关键词

-

资金

  1. National Natural Science Foundation of China [51274209]

向作者/读者索取更多资源

By analyzing the fracture zone and conducting modeling experiments, the layout parameters for the gas drainage roadway (GDR) were determined. The recommended optimal height and horizontal distance can effectively improve the gas drainage effect in mining operations.
To determine the layout parameters of the gas drainage roadway (GDR) serving for the working face, an analytical calculation method of fracture zone and the modelling experiment were adopted, and the overburden fissure induced by mining and the height of fracture zone were analyzed. For the research on the distribution of fracture zone by analytical calculation method, the multiple factors influencing the failure mode of strata and the height of fracture zone were considered. The #1207 working face in Sima mine was taken as an engineering background, and the layout parameters of GDR were given by analyzing the height of fracture zone. Combining the results obtained by analytical calculation and scale modelling experiment, the suggested height of GDR was 10.7-32.8 m away from the coal seam roof, and the projection distance of GDR in the horizontal was within the range of 0-35 m from the airway. By monitoring the gas drainage effects in different heights away from coal seam roof in #1207 working face and in different horizontal distances away from the ventilation roadway in the #1211 working face, the results showed that the optimal height was 17.5-22 m away from coal roof, and the optimal horizontal distance was 17-21 m away from airway for GDR. The gas drainage effect of GDR indicated that the proposed parameters are scientific and reasonable.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据