4.7 Article

Reliability-driven scheduling of time/cost-constrained grid workflows

出版社

ELSEVIER
DOI: 10.1016/j.future.2015.07.014

关键词

Workflow scheduling; Reliability; Real-time systems; Grid computing; Constrained optimization; Ant colony optimization

资金

  1. Iran Telecommunication Research Center (ITRC), Tehran, Iran [12200/500]

向作者/读者索取更多资源

Workflow scheduling in Grids and Clouds is a NP-Hard problem. Constrained workflow scheduling, arisen in recent years, provides the description of the user requirements through defining constraints on factors like makespan and cost. This paper proposes a scheduling algorithm to maximize the workflow execution reliability while respecting the user-defined deadline and budget. We have used ant colony system to minimize an aggregation of reliability and constraints violation. Three novel heuristics have been proposed which are adaptively selected by ants. Two of them are employed to find feasible schedules and the other is used to enhance the reliability. Two methods have been investigated for time and cost considerations in the resource selection. One of them assigns equal importance to the time and cost factors, and the other weighs them according to the tightness of satisfaction of the corresponding constraints. Simulation results demonstrate the effectiveness of the proposed algorithm in finding feasible schedules with high reliability. As it is shown, as an additional achievement, the Grid profit loss has been decreased. (C) 2015 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据