Evaluation of hydrogeological impact of tunnel engineering in a karst aquifer by coupled discrete-continuum numerical simulations

期刊

JOURNAL OF HYDROLOGY
卷 597, 期 -, 页码 -

出版社

ELSEVIER
DOI: 10.1016/j.jhydrol.2020.125765

关键词

Karst groundwater system; Tunnel construction; Drawdown; Discharge; Area of impact

资金

  1. Guizhou Province Key Science and Technology Project [2007-3005-1]
  2. National Natural Science Foundation of China [51925906]

向作者/读者索取更多资源

The study utilized a coupled discrete-continuum modeling approach to analyze the impact of tunnel construction on karst groundwater systems. Tunnel construction led to widespread groundwater drawdown with a 30% decrease in total discharge through karst conduits. Simulation results predict that after completion of lining, the groundwater system will slowly approach a level 5-10m below the undisturbed level.
Anthropogenic disturbance of karst groundwater systems by large-scale underground engineering activities is an important topic but is difficult to address due to the compound influence of the heterogeneity and construction progression. In this study, we adopt the coupled discrete-continuum modeling approach where both the tunnels and karst conduits are treated as discrete channels. Based on extensive site characterization, groundwater observations, and tunnel discharge data, we establish a three-dimensional coupled model for a karst aquifer where deeply-buried, long tunnels are being constructed. We perform high-resolution simulations to quantitatively evaluate the spatial and temporal characteristics of the tunnel construction impact on a karst groundwater system. The simulation results satisfactorily reproduce the tunnel discharge time-series. We show that the excavation and lining schedule is an important factor to consider when evaluating the hydrogeological impact. During tunnel construction, the groundwater drainage through the tunnels (5.3 x 10(7) m(3)) accounts for a significant part of the total groundwater discharge (similar to 11%) in the studied area. The continuous water influx to the tunnels results in widespread drawdown with an area of impact (with drawdown >5 m) covering 64.0% of the entire study area after four years of construction. The total discharge through karst conduits decreases by about 30% in response to the tunnel construction. Our simulation results predict that after completion of lining the groundwater system will slowly approach a groundwater level 5-10 m below the undisturbed level. This work demonstrates the use of coupled discrete-continuum models to study regional groundwater flow in karst aquifers affected by tunnel engineering activities and also provides a guidance for the impact assessment of other underground engineering projects in mining and transportation industries. The simulation methodology may be exploited for optimization of the construction plans to minimize hydrogeological impact and to ensure construction safety.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据