期刊
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
卷 27, 期 5, 页码 316-330出版社
VILNIUS GEDIMINAS TECH UNIV
DOI: 10.3846/jcem.2021.14919
关键词
CAD project; Public Private Partnerships; indicator system; system dynamics; performance measurement; case study
资金
- National Natural Science Foundation of China [51978164]
- Ministry of education in the humanities and social sciences of China [20YJCZH182]
This study focuses on analyzing the construction, operation, and handover process of civil air defense PPP projects, proposing a set of performance evaluation indicators, and establishing a system dynamics model for dynamic performance evaluation and simulation. The research results provide scientific and reasonable help for the performance management of civil air defense PPP projects, as well as highlighting the important role of the government in these projects.
Public Private Partnership (PPP) mode is increasingly applied in civil air defense (CAD) projects to improve project quality and reduce the government's financial pressure. Because CAD project has different attributes during wartime and peacetime states, it's necessary to comprehensively consider the project performance under different states to conduct scientific performance measurement. This paper focuses on the process of construction, operation, and handover of CAD PPP project to construct a unified project performance measurement indicator system, then a system dynamics (SD) model is established to carry out dynamic performance measurement and simulation of CAD PPP project under different social states respectively. A case study is conducted to verify the effectiveness of the proposed SD model, model validation, sensitivity analysis and result analysis were included as well. The study result can make the project performance management of CAD PPP more scientific and reasonable, and help decision-makers to formulate effective performance improvement strategies. It's found out that government plays an important role in CAD PPP projects, when resources are limited, the government should give priority to measures such as reducing tax rates and increasing subsidies to ensure project benefits. The research methods can also provide reference for performance measurement of other PPP projects.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据