4.8 Article

Two-stage stochastic programming formulation for optimal design and operation of multi-microgrid system using data-based modeling of renewable energy sources

期刊

APPLIED ENERGY
卷 291, 期 -, 页码 -

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.apenergy.2021.116830

关键词

Multi-microgrid; Uncertainty modeling; Two-stage stochastic programming; Monte Carlo simulation; Optimal topology; Optimal operation

资金

  1. Carbon-to-X (C2X) RAMP
  2. D project - National Research Foundation (NRF) of the Ministry of Science and ICT [2020M3H7A1096361]

向作者/读者索取更多资源

Microgrid (MG) is designed to accommodate distributed renewable energy sources and manage electricity generation using dispatch and storage systems to meet local demand. Multi-microgrid (MMG) systems can alleviate demand-supply mismatch issues through energy trading between individual MGs, but their design and operation become more complex. A two-stage stochastic decision-making approach is proposed in this study to design and operate an MMG while considering both capital and operating costs for electric cable installations. Stochastic models are developed using real weather data to describe the uncertain nature of energy production through renewable sources, and decisions are made in the first stage regarding the installation of electric cables between individual MGs to achieve the best tradeoff.
Microgrid (MG) is intended to accommodate distributed renewable energy sources and manage the generated electricity using a dispatch and storage system to satisfy the demand of a local region over time. Main challenges associated with operating such a system stems primarily from the intermittent and uncertain nature of renewable energy sources causing the energy generation to be highly irregular and less predictable. Multi-microgrid (MMG) systems with flexibility to trade energy between individual MGs can alleviate the demand-supply mismatch problem, but its design and operation become more complicated. Previous studies on MMGs addressed only the case where all the MGs are fully connected to share electricity. However, the installation of electric cable connections over the full network can be costly and is often unjustified. To address the question of how to best achieve a tradeoff, this work proposes the use of a two-stage stochastic decision-making approach for designing and operating an MMG considering both the capital cost for installing the electric cables and operating cost. First, real weather data are used to develop stochastic models that describe the uncertain, intermittent nature of energy production through renewable sources over a day. Then, in the first stage, design-level decisions regarding the installation of the electric cable between individual pairs of the MGs are to be determined to achieve the best tradeoff for the modeled system and weather pattern. In the second stage, the optimal energy dispatch planning for each individual MG including the energy trading between the MGs is carried out based on a particular realized scenario of the renewable energy production.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据