4.6 Article

Application of improved fuzzy best worst analytic hierarchy process on renewable energy

期刊

PEERJ COMPUTER SCIENCE
卷 -, 期 -, 页码 -

出版社

PEERJ INC
DOI: 10.7717/peerj-cs.453

关键词

Fuzzy BWM; Fuzzy AHP; Trapezoidal fuzzy number; Climate change; Hydro power plant

向作者/读者索取更多资源

This work introduces a novel fuzzy decision making technique based on trapezoidal fuzzy number and presents a new hybrid MCDM technique. The results are validated through comparative study, scenario analysis and sensitivity analysis.
In this work, a novel fuzzy decision making technique namely trapezoidal fuzzy Best-Worst method (fuzzy BWM) is developed which is based on Best-Worst method (BWM) and Trapezoidal fuzzy number. The real motive behind our work is to take a broad view of the existing fuzzy BWM based on triangular fuzzy number by trapezoidal fuzzy number. Also, we have presented a new hybrid MCDM technique called as Trapezoidal fuzzy Best Worst Analytic Hierarchy based on proposed trapezoidal fuzzy BWM and existing trapezoidal fuzzy Analytic Hierarchy Process (AHP). BWM approach is employed in evaluating the PV of considering criteria and trapezoidal fuzzy AHP is used to assess the local priority vale (PV) of considering alternatives (or indicators) of a decision problem. Moreover it used to identify the most significant alternative which is responsible for performance efficiency of a hydro power plant under climatic scenario. From the result, it is undoubtedly found that hydraulic had is most responsible indicator. Further, the CR (consistency ratio) value which is determined by our proposed trapezoidal fuzzy BWM is less than that of existing BWM and fuzzy BWM techniques. Finally, we have validated our result by comparative study, scenario analysis and sensitivity analysis.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据