4.7 Article

Energy-ef fi cient scheduling for a permutation fl ow shop with variable transportation time using an improved discrete whale swarm optimization

相关参考文献

注意:仅列出部分参考文献,下载原文获取全部文献信息。
Article Management

Green product development under competition: A study of the fashion apparel industry

Shu Guo et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2020)

Article Computer Science, Artificial Intelligence

A guided population archive whale optimization algorithm for solving multiobjective optimization problems

Adel Got et al.

EXPERT SYSTEMS WITH APPLICATIONS (2020)

Article Engineering, Multidisciplinary

Sustainable belt conveyor operation by active speed control

Daijie He et al.

MEASUREMENT (2020)

Article Computer Science, Artificial Intelligence

Energy-efficient distributed permutation flow shop scheduling problem using a multi-objective whale swarm algorithm

Guangchen Wang et al.

SWARM AND EVOLUTIONARY COMPUTATION (2020)

Article Green & Sustainable Science & Technology

MILP models for energy-aware flexible job shop scheduling problem

Leilei Meng et al.

JOURNAL OF CLEANER PRODUCTION (2019)

Article Computer Science, Interdisciplinary Applications

Multi-objective energy-aware batch scheduling using ant colony optimization algorithm

Zhao-hong Jia et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2019)

Article Green & Sustainable Science & Technology

A multi-objective iterated local search algorithm for comprehensive energy-aware hybrid flow shop scheduling

Sven Schulz et al.

JOURNAL OF CLEANER PRODUCTION (2019)

Article Green & Sustainable Science & Technology

Energy-efficient scheduling for multi-objective flexible job shops with variable processing speeds by grey wolf optimization

Shu Luo et al.

JOURNAL OF CLEANER PRODUCTION (2019)

Article Engineering, Industrial

Flow shop scheduling with grid-integrated onsite wind power using stochastic MILP

Konstantin Biel et al.

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2018)

Article Management

Solving the flexible job shop scheduling problem with sequence-dependent setup times

Liji Shen et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2018)

Article Computer Science, Theory & Methods

被撤回的出版物: A hybrid whale optimization algorithm based on local search strategy for the permutation flow shop scheduling problem (Retracted article. See vol. 128, pg. 567, 2022)

Mohamed Abdel-Basset et al.

FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE (2018)

Article Automation & Control Systems

A Collaborative Multiobjective Fruit Fly Optimization Algorithm for the Resource Constrained Unrelated Parallel Machine Green Scheduling Problem

Xiao-Long Zheng et al.

IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS (2018)

Article Engineering, Industrial

A shuffled frog-leaping algorithm for flexible job shop scheduling with the consideration of energy consumption

Deming Lei et al.

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2017)

Article Green & Sustainable Science & Technology

Energy-efficient permutation flow shop scheduling problem using a hybrid multi-objective backtracking search algorithm

Chao Lu et al.

JOURNAL OF CLEANER PRODUCTION (2017)

Article Computer Science, Interdisciplinary Applications

Energy-efficient bi-objective single-machine scheduling with power-down mechanism

Ada Che et al.

COMPUTERS & OPERATIONS RESEARCH (2017)

Article Computer Science, Interdisciplinary Applications

The Whale Optimization Algorithm

Seyedali Mirjalili et al.

ADVANCES IN ENGINEERING SOFTWARE (2016)

Article Management

Green scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption

S. Afshin Mansouri et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2016)

Article Management

Energy-efficient scheduling in manufacturing companies: A review and research framework

Christian Gahm et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2016)

Article Computer Science, Artificial Intelligence

A fast and elitist multiobjective genetic algorithm: NSGA-II

K Deb et al.

IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2002)