4.7 Article

Stochastic optimization model for the short-term joint operation of photovoltaic power and hydropower plants based on chance-constrained programming

期刊

ENERGY
卷 222, 期 -, 页码 -

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.energy.2021.119996

关键词

Hydro-PV hybrid Energy system; Uncertainty of PV power; Chance-constrained programming; Mixed integer linear programming

资金

  1. National Natural Sciences Foundation of China [51779229]
  2. Scientific Research Projects of Henan Province [202102310296]

向作者/读者索取更多资源

The paper proposed a coordination mode between a PV plant and a large-capacity hydropower plant, and utilized a stochastic optimization model to promote renewable energy consumption, achieving joint operation of a hydro-PV system.
Integrating photovoltaic (PV) power into large-capacity hydropower plants is considered as an efficient and promising approach for large-scale PV power accommodation. To improve the guidelines for the optimal operation of large-scale hydro-PV hybrid systems, this paper proposes a practical coordination mode of a PV plant and a large-capacity hydropower plant based on the negotiation mechanism between the power generation company and the power grid. A chance-constrained programming (CCP) based stochastic optimization model is then presented to determine the short-term joint operation of a hydro PV system, aiming at promoting renewable energy consumption. To improve the solution efficiency, several linearization approaches are proposed to convert the original model into a scenario-based mixed integer linear programming (MILP) problem. The real-world case studies demonstrate that the joint operation of the hydro-PV hybrid system can promote the consumption of renewable energy while making the actual total power output track the schedule submitted to the power grid. Moreover, the confidence level at which the power balance constraints can be met exceeds 90% in all weather conditions, far above the confidence level of less than 50% for the deterministic model, proving the stochastic model would be a better choice for the joint operation of a hydro-PV system. (c) 2021 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据