4.7 Article

Performance analysis and multi-objective optimization of the high-temperature cascade heat pump system

期刊

ENERGY
卷 223, 期 -, 页码 -

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.energy.2021.120097

关键词

High-temperature cascade heat pump system; Thermodynamic analysis; Economic analysis; Multi-objective optimization

资金

  1. 973 National Basic Research Program of China [2015CB251403]
  2. Postdoctoral funded project of advanced discipline construction of Engineering Science

向作者/读者索取更多资源

This paper introduces a high-temperature cascade heat pump system with high compression ratio, which shows good stability and feasibility under various operating conditions. After economic and thermodynamic performance analysis, a multi-objective optimization method was developed to achieve the optimal heating capacity and annual net profit. The optimized system has a heating capacity of 498.9 kW and a payback period of 3.9 years at the optimal temperatures.
This paper presents a high-temperature cascade heat pump system with a high compression ratio for recovering the waste heat of the chemical plant and replacing the steam. To analyze the economic and the thermodynamic performance of the high-temperature cascade heat pump, a mathematical model, considering energy, exergy, economy and environment, has been developed under different heat source inlet temperature. The proposed system here indicated good stability and feasibility under various operating conditions according to the simulation results. However, as the heating capacity and the annual net profit were found to be conflicting with each other, a multi-objective optimization method was developed to solve this problem. In addition, the technique for Order of Preference by Similarity to Ideal Solution method was selected as the decision-making method to search for the final optimal result of the system. The optimization results showed that if the optimized heating capacity project was selected, the average heating capacity and the average annual net profit were 2.8% and 6.7% lower than their maximum possible values. At the optimal heat source inlet temperature of 71 degrees C and condensing temperature of 145 degrees C, the heating capacity of the system was 498.9 kW and the payback period was 3.9 year. (C) 2021 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据