4.6 Article

Sustainability-Oriented Project Scheduling Based on Z-Fuzzy Numbers for Public Institutions

期刊

SUSTAINABILITY
卷 13, 期 5, 页码 -

出版社

MDPI
DOI: 10.3390/su13052801

关键词

sustainability; project management; scheduling; public infrastructures; Z-fuzzy number

资金

  1. National Science Centre (Poland) [394311, 2017/27/B/HS4/01881]

向作者/读者索取更多资源

A new approach is proposed for sustainable project scheduling for public institutions, considering experts' opinions on different aspects of sustainability. A fuzzy bicriterial optimization model is established to obtain a project schedule meeting acceptable sustainability, duration, and cost requirements. The model is inspired by a real-world infrastructure project implemented by a public institution in Poland in 2019.
A new approach to sustainable project scheduling for public institutions is proposed. The approach is based on experts' opinions on three aspects of sustainability of project activities (human resources consumption, material consumption and negative influence on local communities), expressed by means of Z-fuzzy numbers. A fuzzy bicriterial optimization model is proposed, whose objective is to obtain a project schedule of an acceptable sustainability degree and of acceptable duration and cost. The model was inspired and is illustrated by a real-world infrastructure project, implemented in 2019 by a public institution in Poland.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据