Dynamic reduction of time and cost uncertainties in tunneling projects

期刊

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.tust.2020.103774

关键词

Dynamic prediction tool; Tunnel ground conditions; Tunnel construction time and costs; Continuous space-discrete state Markov process; Monte-Carlo simulation; Updating procedure

向作者/读者索取更多资源

This article explores the reduction of geological/geotechnical uncertainties in tunnel construction time and costs through continuous updating techniques, with geological condition forecasting based on Markov process and construction time/cost prediction based on Monte-Carlo simulation. Empirical findings suggest that tool updates can significantly reduce uncertainties during construction processes.
The cost and time estimation play a vital role in successfully completing a tunnel construction, however in most cases the estimation falls short compared to the actual time and cost that a tunnel construction consumes due to a number of geological and geotechnical reasons. This creates uncertainties in tunnel construction in terms time and cost. In this article, the effects of geological/geotechnical uncertainties in tunnel construction time and costs are being minimized through continuous updating techniques. The forecasting of geological conditions is based on continuous space-discrete state Markov process. Whereas, predicting the construction time and costs are based on Monte-Carlo (MC) simulation. To verify the tool applicability, it has been applied to Hamru tunnel in Iran. Also, to assess the updating effect on obtained outcomes during construction, the tool has been updated two times. In the first update, the total uncertainty in construction time and costs (measured by standard deviation) has been reduced by about 45% and 52%, respectively, followed by a reduction by about 66% and 61% in the second update. Finally, we can conclude that, the presented methodology is a helpful tool for tunnel project managers to identify risks and the possibility of deviations in their construction time and costs.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据