4.7 Article

A new analytical method to optimise the preventive maintenance interval by using a semi-Markov process and z-transform with an application to marine diesel engines

期刊

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.ress.2020.107394

关键词

Maintenance interval; Maintenance model; Semi-Markov process; Finite horizon; Maintenance cost

向作者/读者索取更多资源

This article presents a novel method based on a semi-Markov process approach and the z transform to calculate the optimal time interval until the preventive maintenance intervention. The method provides a powerful tool for maintenance managers to develop maintenance plans efficiently and simplify economic analysis.
This article presents a novel method based on a semi-Markov process approach and the z transform to calculate the optimal time interval until the preventive maintenance intervention. For this, a mathematical expression that has its origin in the evolution of the maintenance cost of a patrol boat's propulsion engine is developed, represented mathematically by a system of difference equations. This method can be applied to all assets that are subject to wear, which are very common on industrial facilities. This mathematical expression for the preventive interval is a powerful tool for maintenance managers because this saves him from resorting to complicated mathematical methods. In addition to the proposed mathematical formula, the manager needs to know the assets' failure history data and the costs of maintenance interventions. These data are usually available, making their practical application fast and easy to develop. Due to the method being analytical, it could also serve as an excellent decision support tool. It can be applied to the desired time horizon guaranteeing the obtention of the optimal interval. In many other cases, applying the model can simplify the process of obtaining the asset maintenance programme, from an economic perspective.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据