4.6 Article

A simulation-optimization model for solving flexible flow shop scheduling problems with rework and transportation

期刊

MATHEMATICS AND COMPUTERS IN SIMULATION
卷 180, 期 -, 页码 152-178

出版社

ELSEVIER
DOI: 10.1016/j.matcom.2020.08.019

关键词

Flexible flow shop scheduling; multi-objective harmony search; Gaussian mutation; Simulation and computational experiments; Sequence-dependent setup times; Response surface methodology

资金

  1. Czech Science Foundation [R 19-13946S]

向作者/读者索取更多资源

An enhanced multi-objective harmony search algorithm is proposed to solve the flexible flow shop scheduling problems, with experimental results demonstrating its effectiveness.
We propose an enhanced multi-objective harmony search (EMOHS) algorithm and a Gaussian mutation to solve the flexible flow shop scheduling problems with sequence-based setup time, transportation time, and probable rework. A constructive heuristic is used to generate the initial solution, and clustering is applied to improve the solution. The proposed algorithm uses response surface methodology to minimize both maximum completion time and mean tardiness, concurrently. We evaluate the efficacy of the proposed algorithm using computational experiments based on five measures of diversity metric, simultaneous rate of achievement for two objectives, mean ideal distance, quality metric, and coverage. The experimental results demonstrate the effectiveness of the proposed EMOHS compared with the existing algorithms for solving multi-objective problems. (C) 2020 International Association for Mathematics and Computers in Simulation (IMACS). Published by Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据