期刊
ENERGY
卷 109, 期 -, 页码 365-377出版社
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.energy.2016.04.067
关键词
MG scheduling; UT (Unscented transform); Modification approach; Renewable energy sources; Uncertainty
This paper addresses the optimal stochastic scheduling of the distributed generation units in a micro-grid. In this way, it introduces a new sufficient stochastic framework to model the correlated uncertainties in the micro-grid that includes different types of RESs such as photovoltaics, wind turbines, micro-turbine, fuel cell as well as battery as the storage device. The proposed stochastic method makes use of unscented transforms to model correlated uncertain parameters. The ability of the unscented transform method to model correlated uncertain variables is particularly appealing in the context of power systems, wherein noticeable inherent correlation exists. Due to the highly complex nature of the problem, a new optimization method based on the harmony search algorithm along with an intelligent modification method is devised to solve the proposed optimization problem, efficiently. The proposed optimization algorithm is equipped with powerful search mechanisms that make it suitable for solving both discrete and continuous problems. In comparison with the original harmony search algorithm, the proposed modified optimization algorithm has few setting parameters. The new modified harmony search algorithm provides proper balance between the local and global searches. The feasibility and satisfactory performance of performance of the proposed method are examined on two typical grid-connected MGs. (C) 2016 Elsevier Ltd. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据