4.8 Article

Adjustable Uncertainty Set Constrained Unit Commitment With Operation Risk Reduced Through Demand Response

期刊

IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS
卷 17, 期 2, 页码 1154-1165

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TII.2020.2979215

关键词

Uncertainty; Power generation; Optimization; Load management; Probability distribution; Renewable energy sources; Robustness; Adjustable uncertainty set; demand response; renewable energy; unit commitment

资金

  1. National Natural Science Foundation of China [51707069]
  2. Key Laboratory of Control of Power Transmission and Conversion (SJTU), Ministry of Education [2018AB03]
  3. Key Scientific and Technological Research Project of State Grid Corporation of China -Research on the Mechanism of Internet of Thing and Its Key Supporting Technologies for Smooth Integration
  4. EPSRC [EP/M507192/1] Funding Source: UKRI

向作者/读者索取更多资源

The proposed approach introduces an adjustable uncertainty set to address uncertainties in renewable energy unit commitment, optimizing demand response to reduce operation risks of load shedding and RE curtailment. Without predefined parameters, it effectively transforms the original mixed-integer nonlinear problem into a mixed-integer linear problem for verification on IEEE systems. By comparing with existing methods, the effectiveness of the proposed approach in reducing conservativeness and operation risks is confirmed.
In this article, the approach of an adjustable uncertainty set is proposed to deal with the uncertainty of renewable energy (RE) in unit commitment (UC). Demand response (DR) is co-optimized to reduce the operation risk of load shedding and RE curtailment when the RE falls out of the adjustable uncertainty set. In comparison with existing approaches with an adjustable uncertainty set, the proposed approach further incorporates DR requires no predefined parameters to constrain the deviation from the forecast RE. It divides the maximum RE set into subintervals, and bounds of the adjustable uncertainty set are determined among these subintervals with the consideration of DR in reducing the operation risk. The original mixed-integer nonlinear problem of UC scheduling is transformed to be a mixed-integer linear problem to be effectively solved. The performance of the proposed approach is verified on the IEEE 6-bus, 30-bus, and 300-bus systems. Through the comparison with existing methods, the effectiveness of the proposed approach in reducing the conservativeness is verified. The effectiveness of the proposed approach in the reduction of the operation risk of load shedding and RE curtailment is verified through the comparison between situations with and without DR.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据