4.7 Article

Robust short-term scheduling based on information-gap decision theory for cascade reservoirs considering bilateral contract fulfillment and day-ahead market bidding in source systems

期刊

ENVIRONMENTAL RESEARCH LETTERS
卷 16, 期 5, 页码 -

出版社

IOP PUBLISHING LTD
DOI: 10.1088/1748-9326/abe6c3

关键词

short-term hydro scheduling; cascade hydropower stations; information-gap decision theory; bilateral contracts; day-ahead market; power market

资金

  1. National Natural Science Foundation of China [51879030, 52039002]

向作者/读者索取更多资源

China is implementing a new power system reform focusing on renewable energy such as hydropower. The study proposes a method based on the information-gap decision theory to address the short-term hydro scheduling problem in the face of upcoming spot market challenges. This method successfully coordinates tasks related to market obligations and bidding under uncertainty, providing robust dispatching results and enhanced profitability through day-ahead market coordination.
China is implementing a new power system reform, with one goal of renewable energy absorption such as hydropower. However, the forthcoming spot market challenges cascade hydropower generation in terms of the short-term hydro scheduling (STHS) problem. Specifically, STHS involves fulfilling bilateral market obligations and bidding for the day-ahead market with uncertainty. Coordination of these two tasks while managing market risks becomes a problem that must be urgently solved. Herein, we propose a method based on the information-gap decision theory (IGDT) to solve the cascade hydropower STHS problem, wherein the aforementioned tasks are coordinated simultaneously. The IGDT method was used to deal with the uncertainty of the day-ahead market price, and the robustness function was derived. A mixed-integer nonlinear programming model was used to describe the proposed problem, and a commercial solver was used to solve it. A four-reservoir cascade hydropower company was used as the research object. Through the robust dispatching results, the preset profit objectives of the power generation company were satisfied within the price information gap, and the day-ahead market bidding strategy and daily contract decomposition curve were obtained. The proposed model is found to be superior to the scenario-based probability method. Moreover, a comparative analysis of bilateral contract fulfillment showed that more profits can be obtained by coordinating contract fulfillment in the day-ahead market.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据