4.4 Article

Optimal scheduling of variable speed pumped storage, solar and wind energy system

出版社

TAYLOR & FRANCIS INC
DOI: 10.1080/15567036.2021.1892243

关键词

Pumped storage plant (PSP); solar; wind; Solar-Wind-PSP; variable speed technology; electricity market; optimal scheduling

资金

  1. All India Council for Technical Education

向作者/读者索取更多资源

The entry of renewable energy sources has significantly impacted the safety and stability of the power sector, with pumped storage hydro plants proving to be effective in balancing demand and generation. The study shows that variable speed operation can increase net profit compared to fixed speed operation.
The entry of renewable energy sources in the power sector has significantly affected the inter-connected power system's safety and stability as renewable energy sources tend to generate variable power. The variability of power inflicts severe challenges for the scheduling of renewable sources. A pumped storage hydro plant (PSP) can help in integrating the variable renewable energy and balance the demand and generation on a day-ahead (DA) or real-time basis through fast response generation. An optimal PSP operation schedule has been obtained to increase the power producer's profit by formulating it as a mixed-integer problem. The mathematical problem formulation for the hybrid system with solar, wind, and PSP operation has been made, considering the next day's market schedule. The revenue has been computed by utilizing the energy of solar, wind, and PSP. A comparative study for the profit earned depending upon the power is regulated or not, using variable speed technology, during the pumping mode has been presented. The grid power has been utilized for the pumping operation of the pumped storage plant. A penalty factor has been utilized for the mismatch in the demand and generation. The analysis shows that the variable speed operation of PSP during pumping mode has increased the net profit by 12% and reduced the charges paid toward the pumping operation by 19% compared to the fixed speed operation and a rise of 3% in profit and 5% decline in pump charges have been recorded compared to twospeed operation.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据