4.5 Article

Air traffic flow management with layered workload constraints

相关参考文献

注意:仅列出部分参考文献,下载原文获取全部文献信息。
Article Management

A Noncompact Formulation for Job-Shop Scheduling Problems in Traffic Management

Leonardo Lamorgese et al.

OPERATIONS RESEARCH (2019)

Article Transportation Science & Technology

Metaheuristics for efficient aircraft scheduling and re-routing at busy terminal control areas

Marcella Sama et al.

TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES (2017)

Article Operations Research & Management Science

Time-Indexed Formulations for the Runway Scheduling Problem

Pasquale Avella et al.

TRANSPORTATION SCIENCE (2017)

Proceedings Paper Computer Science, Theory & Methods

Causal Analysis of Airline Trajectory Preferences to Improve Airspace Capacity

Nina Schefers et al.

ICTE 2016 (2017)

Review Management

A survey of scheduling problems with no-wait in process

Ali Allahverdi

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2016)

Article Computer Science, Hardware & Architecture

Real-Time Scheduling of Aircraft Arrivals and Departures in a Terminal Maneuvering Area

Andrea D'Ariano et al.

NETWORKS (2015)

Article Transportation

Mitigation of airspace congestion impact on airline networks

Bo Vaaben et al.

JOURNAL OF AIR TRANSPORT MANAGEMENT (2015)

Review Computer Science, Artificial Intelligence

Constraint programming for air traffic management: a survey In memory of Pascal Brisset

Cyril Allignol et al.

KNOWLEDGE ENGINEERING REVIEW (2012)

Article Management

Optimal Real-Time Traffic Control in Metro Stations

Carlo Mannino et al.

OPERATIONS RESEARCH (2009)

Article Engineering, Manufacturing

Scheduling models for air traffic control in terminal areas

L Bianco et al.

JOURNAL OF SCHEDULING (2006)

Article Management

Job-shop scheduling with blocking and no-wait constraints

A Mascis et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2002)