4.6 Review

A Meta-Analysis of Environmental Tradeoffs of Hydropower Dams in the Sekong, Sesan, and Srepok (3S) Rivers of the Lower Mekong Basin

期刊

WATER
卷 13, 期 1, 页码 -

出版社

MDPI
DOI: 10.3390/w13010063

关键词

hydropower planning; fish; hydrologic alteration; biodiversity; 3S Basin; connectivity

资金

  1. United States Agency for International Development's Wonders of the Mekong Cooperative Agreement [AID-OAA-A-16-00057]
  2. National Science Foundation [1633756]

向作者/读者索取更多资源

The paper discusses the impacts of hydropower development on the environment in the Mekong riparian countries, especially in the 3S Basin, and the potential ecological and biodiversity losses from future dam construction. It highlights the importance of considering environmental objectives in tradeoff analyses to quantify the environmental costs of dam development and maintain the biodiversity of the Lower Mekong Basin's extraordinary freshwater fishery.
In Mekong riparian countries, hydropower development provides energy, but also threatens biodiversity, ecosystems, food security, and an unparalleled freshwater fishery. The Sekong, Sesan, and Srepok Rivers (3S Basin) are major tributaries to the Lower Mekong River (LMB), making up 10% of the Mekong watershed but supporting nearly 40% of the fish species of the LMB. Forty-five dams have been built, are under construction, or are planned in the 3S Basin. We completed a meta-analysis of aquatic and riparian environmental losses from current, planned, and proposed hydropower dams in the 3S and LMB using 46 papers and reports from the past three decades. Proposed mainstem Stung Treng and Sambor dams were not included in our analysis because Cambodia recently announced a moratorium on mainstem Mekong River dams. More than 50% of studies evaluated hydrologic change from dam development, 33% quantified sediment alteration, and 30% estimated fish production changes. Freshwater fish diversity, non-fish species, primary production, trophic ecology, and nutrient loading objectives were less commonly studied. We visualized human and environmental tradeoffs of 3S dams from the reviewed papers. Overall, Lower Sesan 2, the proposed Sekong Dam, and planned Lower Srepok 3A and Lower Sesan 3 have considerable environmental impacts. Tradeoff analyses should include environmental objectives by representing organisms, habitats, and ecosystems to quantify environmental costs of dam development and maintain the biodiversity and extraordinary freshwater fishery of the LMB.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据